Laserfiche WebLink
TIMOTHY ROSE CONTRACTING, INC. <br /> 1360 Old Dixie Highway SW, Suite 106 <br /> Vero Beach , Florida 32962 <br /> ( 772) 564 7800 <br /> ( 772 ) 564 7888 <br /> Timrose7@comcast . net <br /> September 30, 2011 <br /> Indian River County Utilities <br /> Attn : Mike Hotchkiss <br /> 180027 th Street <br /> Vero Beach , FI 32960 <br /> RE : N WTP Raw Water Transmission System <br /> FINAL REQUESTED CHANGE ORDER (WCD # 3 ) <br /> Change Order Proposal for Final Contract Changes Per As Builts : <br /> IRCU Items : <br /> Fiber Optic Cable ( L3 Scandia ) — 1, 600 LF Add : $ 21268 . 00 <br /> Conduit and Cable from R105 To PLC Cabinet ( Paragon ) Add : $ 1, 021 . 20 <br /> On Site Repair Service for Well # 5 ( Watertronics Tech ) Add : $ 391 . 00 <br /> Bearing Made @ Apple Machine Add : $ 123 . 00 <br /> 16" Raw Water Main — Adjust 395 LF ( Verified Per As Built ) Add : $ 15 029 . 75 <br /> 16" 90" Bends — (Actual Per As Built ) Add : $ 21099 . 00 <br /> 16" 45 ° Bends — (Actual Per As Built ) Add : $ 11871 . 00 <br /> 20" Raw Water Main — Adjust Less 59 LF (Actual Per As Built ) Deduct : <$ 31401. 35 > <br /> 24" Raw Water Main — Adjust Less 82 LF (Actual Per As Built ) Deduct : < $ 81938 . 00 > <br /> 6 " Thick Concrete Pads — Adjust 2, 208 SF (Actual Per As Built ) Add : $ 61182 . 40 <br /> 6" Thick No . 57 Stone — Adjust 2, 904 SF ( Unused Material Per As Built ) Deduct : <$ 5, 140 . 08> <br /> 20" Gate Valve — Adjustment To CO # 2 Add : $ 357 . 00 <br /> 16" 900 Bend — Adjustment To CO # 2 Deduct : <$ 20340. 00> <br /> 16" 45 ° Bend — Adjustment To CO # 2 Add : $ 11286 . 00 <br /> Parks Dept , Items : <br /> Re-Grade & Sod Slopes @ RV Park Add : $ 850. 00 <br /> Double Gate Installed @ Ag Building Add : 831 .46 <br /> Total Requested Change in Contract Add : $ 12, 490 . 38 <br /> If you have any questions, do not hesitate to contact our office . <br /> Thank you — <br /> Vickie Wright <br /> Timothy Rose Contracting, Inc. <br />