My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-091A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-091A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2015 11:49:59 AM
Creation date
10/1/2015 4:24:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
05/22/2012
Control Number
2012-091A
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents and Specifications
Drainage Culvert Replacements
Area
7th Ave. SW 17th Lane SW
Project Number
1142
Bid Number
2012037
Supplemental fields
SmeadsoftID
11159
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br /> PROTECTION OF THE WORK AND PROPERTY <br /> 1 . 3 TREE AND PLANT PROTECTION <br /> A . Protect existing trees , shrubs and plants on or adjacent to the site that are <br /> shown or designated to remain in place against unnecessary cutting , breaking or <br /> skinning of trunk , branches , bark or roots . <br /> Be Do not store or park materials or equipment within the drip line . <br /> C . Install temporary fences or barricades to protect trees and plants in areas <br /> subject to traffic . <br /> D . Fires shall not be permitted under or adjacent to trees and plants . <br /> E . Within the limits of the Work , water trees and plants that are to remain , in order <br /> to maintain their health during construction operations . <br /> F . Cover all exposed roots with burlap and keep it continuously wet . Cover all <br /> exposed roots with earth as soon as possible . Protect root systems from <br /> mechanical damage and damage by erosion , flooding , run -off or noxious <br /> materials in solution . <br /> G . If branches or trunks are damaged , prune branches immediately and protect the <br /> cut or damaged areas with emulsified asphalt compounded specifically for <br /> horticultural use . <br /> H . Remove all damaged trees and plants that die or suffer permanent injury and <br /> replace them with a specimen of equal or better quality . <br /> I . Coordinate Work in this Section with requirements of other sections herein . <br /> 1 . 4 PROTECTION OF IRRIGATION <br /> The CONTRACTOR shall be responsible for maintaining in good condition all <br /> irrigation systems within the easements , which could be damaged by <br /> construction activities . The CONTRACTOR shall repair any irrigation systems <br /> damaged by construction activities within two (2 ) days . Irrigation systems <br /> partially within the right-of-way of 7th Avenue SW , 15th Avenue , 13 h Avenue , <br /> 11th Avenue , 25th Street SW and all intersecting side streets within project limits <br /> may be cut off and capped or connected to same system to maintain <br /> functionality . The CONTRACTOR shall be responsible for maintaining the <br /> functionality of the remaining portion of the system if it should fall outside of the <br /> right- of-way . <br /> 01541 -2 <br /> F : \Public Works\ENGINEERING DIVISION PROJECTS\ 1142 - Misc Culvert Replacements\Admim \bid <br /> documents\01541 - Protection of Property . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.