My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-091A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-091A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2015 11:49:59 AM
Creation date
10/1/2015 4:24:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
05/22/2012
Control Number
2012-091A
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents and Specifications
Drainage Culvert Replacements
Area
7th Ave. SW 17th Lane SW
Project Number
1142
Bid Number
2012037
Supplemental fields
SmeadsoftID
11159
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01820 <br /> Post Final Inspection <br /> 1 . 1 GENERAL <br /> A . Approximately one year after Substantial Completion , the OWNER will make <br /> arrangements with the Construction Coordination Manager and the <br /> CONTRACTOR for a post final inspection and will send a written notice to said <br /> parties to inform them of the date and time of the inspection . <br /> Be Corrections of defective work noted by OWNER and Construction Coordination <br /> Manager shall comply with the applicable sections of Article 13 , General <br /> Conditions . <br /> C . After the inspection , the OWNER will inform the CONTRACTOR of any <br /> corrections required to release the performance and payment bonds . <br /> 001820 - Post Final Inspection . doc <br /> 001820 - 1 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1142-Misc Culvert Replacements\Admim\bid documents\001820 - Post Final Inspection. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.