My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-091A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-091A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2015 11:49:59 AM
Creation date
10/1/2015 4:24:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
05/22/2012
Control Number
2012-091A
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents and Specifications
Drainage Culvert Replacements
Area
7th Ave. SW 17th Lane SW
Project Number
1142
Bid Number
2012037
Supplemental fields
SmeadsoftID
11159
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Replacement of Defective Sod : Any dead sod or sod showing ( less than 95 % of a <br /> square ) indication of probable non survival or lack of health and vigor , or which do not <br /> exhibit the characteristics to meet specifications , shall be replaced within two weeks of <br /> notice from Owner or Engineer . All replacement sod shall be furnished /installed at no <br /> additional cost to the Owner and shall be guaranteed for three months . All replacement <br /> shall meet original specifications . <br /> The Contractor shall notify the Owner and Engineer ten days prior to the end of the <br /> guarantee period and such guarantee shall be extended until notification is received . <br /> At the end of the guarantee period , all sod that is dead or in unsatisfactory growth shall <br /> be replaced within two weeks . <br /> D . Fertilizer: Commercial fertilizers shall comply with the state fertilizer laws . <br /> The numerical designations for fertilizer indicate the minimum percentages <br /> ( respectively) of ( 1 ) total nitrogen , (2 ) available phosphoric acid and ( 3 ) water-soluble <br /> potash contained in the fertilizer . <br /> The chemical designation of the fertilizer shall be 164- 8 . Fertilizer shall include iron , <br /> minor nutrients and trace elements . At least 50 percent of the nitrogen shall be derived <br /> from organic sources . At least 50 percent of the phosphoric acid shall be from normal <br /> super phosphate or an equivalent source which will provide a minimum of two units of <br /> sulfur. The amount of sulfur shall be indicated on the quantitative analysis card <br /> attached to each bag or other container. <br /> Contractor shall ensure 1 pound of nitrogen per 1 , 000 square feet . <br /> E . Water for Grassing : Contractor shall provide the water used in the sodding <br /> operations as necessary to meet the requirements of Article 570 - 5 and 2 . 34 . 8 . <br /> F . Preparation of Ground : The area over which the sod is to be placed shall be <br /> scarified or loosened to a depth and then raked smooth and free from debris . Where <br /> the soil is sufficiently loose and clean , the Owner, at his discretion , may authorize the <br /> elimination of ground preparation . <br /> G . Application of Fertilizer: Before applying fertilizer , the soil pH shall be brought to a <br /> range of 6 . 0 - 7 . 0 . <br /> Contractor shall apply two (2 ) applications . The initial shall be fertilizer and the second <br /> application shall be "weed and feed " . <br /> The fertilizer shall be spread uniformly over the sodded area at the rate of 436 pounds <br /> per acre , or 10 pounds per 1 , 000 square feet , by a spreading device capable of <br /> uniformly distributing the material at the specified rate . <br /> Contractor shall apply applications as per manufacturer's specification . All tickets from <br /> bags shall be handed over to the County Inspector . <br /> On steep slopes , where the use of a machine for spreading or mixing is not <br /> practicable , the fertilizer shall be spread by hand and raked in and thoroughly mixed <br /> with the soil to a depth of approximately 2 inches . <br /> H . Placing Sod : The sod shall be placed on the prepared surface , with edges in close <br /> contact and shall be firmly and smoothly embedded by light tamping with appropriate <br /> tools . <br /> 01025-25 Technical Specifications <br /> F : \Public Works\ENGINEERING DIVISION PROJECTS\1142-Misc Culvert Replacements\Admim\bid documents\Technical <br /> Specifications . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.