My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-091A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-091A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2015 11:49:59 AM
Creation date
10/1/2015 4:24:04 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Migration
Approved Date
05/22/2012
Control Number
2012-091A
Agenda Item Number
8.F.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents and Specifications
Drainage Culvert Replacements
Area
7th Ave. SW 17th Lane SW
Project Number
1142
Bid Number
2012037
Supplemental fields
SmeadsoftID
11159
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a . such condition must meet any one or <br /> more of the categories described in para. 1 . OWNER and ENGINEER shall not <br /> graph 4 . 03 . A; and be responsible for the accuracy or com - <br /> pleteness of any such information or data ; and <br /> b . with respect to Work that is paid for <br /> on a Unit Price Basis , any adjustment in 2 , the cost of all of the following will <br /> be <br /> Contract Price will be subject to the included in the Contract Price , and CONTRAC. <br /> provisions of paragraphs 9 . 08 and 11 . 03 . TOR shall have full responsibility for: <br /> 2 . CONTRACTOR shall not be entitled a . reviewing and checking all such <br /> to any adjustment in the Contract Price or information and data , <br /> Contract Times if: <br /> b . locating all Underground Facilities <br /> a . CONTRACTOR knew of the shown or indicated in the Contract <br /> existence of such conditions at the time Documents , <br /> CONTRACTOR made a final commitment <br /> to OWNER in respect of Contract Price and c, coordination of the Work with the <br /> Contract Times by the submission of a Bid owners of such Underground Facilities , <br /> or becoming bound under a negotiated including OWNER , during construction , and <br /> contract; or <br /> d . the safety and protection of all such <br /> b , the existence of such condition could Underground Facilities and repairing any <br /> reasonably have been discovered or damage thereto resulting from the Work , <br /> revealed as a result of any examination , <br /> investigation , exploration , test, or study of B . Not Shown or Indicated <br /> the Site and contiguous areas required by <br /> the Bidding Requirements or Contract 1 . If an Underground Facility is <br /> Documents to be conducted by or for CON - uncovered or revealed at or contiguous to the <br /> TRACTOR prior to CONTRACTOR 's Site which was not shown or indicated , or not <br /> making such final commitment; or shown or indicated with reasonable accuracy in <br /> the Contract Documents , CONTRACTOR <br /> c . CONTRACTOR failed to give the shall , promptly after becoming aware thereof <br /> written notice within the time and as re- and before further disturbing conditions <br /> quired by paragraph 4 . 03 . A. affected thereby or performing any Work in <br /> connection therewith (except in an emergency <br /> 3 . If OWNER and CONTRACTOR are as required by paragraph 6 . 16 . A) , identify the <br /> unable to agree on entitlement to or on the owner of such Underground Facility and give <br /> amount or extent, if any, of any adjustment in written notice to that owner and to OWNER <br /> the Contract Price or Contract Times , or both , and ENGINEER . ENGINEER will promptly <br /> a Claim may be made therefor as provided in review the Underground Facility and determine <br /> paragraph 10 . 05 . However, OWNER , the extent, if any, to which a change is required <br /> ENGINEER , and ENGINEER ' s Consultants in the Contract Documents to reflect and <br /> shall not be liable to CONTRACTOR for any document the consequences of the existence <br /> claims , costs , losses , or damages ( including or location of the Underground Facility. During <br /> but not limited to all fees and charges of such time , CONTRACTOR shall be <br /> engineers , architects , attorneys , and other responsible for the safety and protection of <br /> professionals and all court or arbitration or such Underground Facility . <br /> other dispute resolution costs ) sustained by <br /> CONTRACTOR on or in connection with any 2 . If ENGINEER concludes that a <br /> other project or anticipated project, change in the Contract Documents is required , <br /> a Work Change Directive or a Change Order <br /> 4 . 04 Underground Facilities will be issued to reflect and document such <br /> consequences . An equitable adjustment shall <br /> A. Shown or Indicated: The information and be made in the Contract Price or Contract <br /> data shown or indicated in the Contract Documents Times , or both , to the extent that they are <br /> with respect to existing Underground Facilities at or attributable to the existence or location of any <br /> contiguous to the Site is based on information and Underground Facility that was not shown <br />or <br /> data furnished to OWNER or ENGINEER by the indicated or not shown or indicated with <br /> owners of such Underground Facilities , including reasonable accuracy in the Contract <br /> OWNER , or by others . Unless it is otherwise Documents and that CONTRACTOR did not <br /> expressly provided in the Supplementary Conditions : know of and could not reasonably have been <br /> 00700 - General Conditions REV 04-07. doc <br /> 00700 - 12 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\ 1142-Misc Culvert Replacements\Admim\bid documents\00700 - General Conditions REV 04-07. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.