Laserfiche WebLink
submitted in accordance with the requirements b . CONTRACTOR shall submit suffi- <br /> of Article 12 . Such adjustments may only be cient information as provided below to allow <br /> made by a Change Order or Written Amend - ENGINEER to determine that the item of <br /> ment in accordance with Article 12 , material or equipment proposed is <br /> essentially equivalent to that named and an <br /> 6 . 05 Substitutes and "Or-Equals " acceptable substitute therefor. Requests <br /> for review of proposed substitute items of <br /> A. Whenever an item of material or equipment material or equipment will not be accepted <br /> is specified or described in the Contract Documents by ENGINEER from anyone other than <br /> by using the name of a proprietary item or the name CONTRACTOR , <br /> of a particular Supplier, the specification or <br /> description is intended to establish the type , function , c. The procedure for review by ENGI - <br /> appearance , and quality required . Unless the NEER will be as set forth in paragraph <br /> specification or description contains or is followed by 6 . 05 . A. 2 . d , as supplemented in the General <br /> words reading that no like , equivalent, or " or-equal" Requirements and as ENGINEER may <br /> item or no substitution is permitted , other items of decide is appropriate under the <br /> material or equipment or material or equipment of circumstances . <br /> other Suppliers may be submitted to ENGINEER for <br /> review under the circumstances described below. d . CONTRACTOR shall first make <br /> written application to ENGINEER for review <br /> 1 . "Or-Equal" Items: If in ENGINEER 's of a proposed substitute item of material or <br /> sole discretion an item of material or equip- equipment that CONTRACTOR seeks to <br /> ment proposed by CONTRACTOR is function - furnish or use . The application shall certify <br /> ally equal to that named and sufficiently similar that the proposed substitute item will <br /> so that no change in related Work will be perform adequately the functions and <br /> required , it may be considered by ENGINEER achieve the results called for by the general <br /> as an "or-equal" item , in which case review and design , be similar in substance to that <br /> approval of the proposed item may , in specified , and be suited to the same use as <br /> ENGINEER ' s sole discretion , be accomplished that specified . The application will state the <br /> without compliance with some or all of the extent, if any, to which the use of the <br />pro- <br /> requirements for approval of proposed substi- posed substitute item will prejudice <br /> tute items . For the purposes of this paragraph CONTRACTOR ' s achievement of Substan - <br /> 6 . 05 . A. 1 , a proposed item of material or tial Completion on time , whether or not use <br /> equipment will be considered functionally equal of the proposed substitute item in the Work <br /> to an item so named if: will require a change in any of the Contract <br /> Documents (or in the provisions of any <br /> a . in the exercise of reasonable other direct contract with OWNER for work <br /> judgment ENGINEER determines that: ( i ) it on the Project) to adapt the design to the <br /> is at least equal in quality, durability, proposed substitute item and whether or <br /> appearance , strength , and design not incorporation or use of the proposed <br /> characteristics ; ( ii ) it will reliably perform at substitute item in connection with the Work <br /> least equally well the function imposed by is subject to payment of any license fee or <br /> the design concept of the completed royalty . All variations of the proposed <br /> Project as a functioning whole , and ; substitute item from that specified will be <br /> identified in the application , and available <br /> b . CONTRACTOR certifies that: ( i) engineering , sales , maintenance , repair, <br /> there is no increase in cost to the OWNER ; and replacement services will be indicated . <br /> and ( ii) it will conform substantially, even The application will also contain an <br /> with deviations , to the detailed requirements itemized estimate of all costs or credits that <br /> of the item named in the Contract will result directly or indirectly from use of <br /> Documents . such substitute item , including costs of <br /> redesign and claims of other contractors <br /> 2 . Substitute Items affected by any resulting change , all of <br /> which will be considered by ENGINEER in <br /> a . If in ENGINEER ' s sole discretion an evaluating the proposed substitute item , <br /> item of material or equipment proposed by ENGINEER may require CONTRACTOR to <br /> CONTRACTOR does not qualify as an furnish additional data about the proposed <br /> "or-equal " item under paragraph 6 . 05 . A. 11 it substitute item , <br /> will be considered a proposed substitute <br /> item . B . Substitute Construction Methods or Proce- <br /> dures: If a specific means , method , technique , se- <br /> 00700 - General Conditions REV 04-07 . doc <br /> 00700 - 19 <br /> F' \Public Works\ENGINEERING DIVISION PROJECTS\1142-Mise Culvert ReplacementsMrnim\bid documents\00700 - General Conditions REV 04-07 . doc <br />