Laserfiche WebLink
Ie <br /> .a ;<utk"`^4 +'�* ' P'W"S ,+s"' m3 71 ; ved, <br /> , 1 ,.. �S Y .. ,x `��, : '. "4 ar' c v. *�yfr zt d ,. ., r f,, <br /> SECTION 01009 <br /> SPECIAL PROVISIONS <br /> 1 . 1 GENERAL <br /> A . Visits to the construction site may be made by representatives of permitting or <br /> IF governing bodies . Submit details of all instructions from the above to the ENGINEER <br /> immediately . The Work will not be accepted by the OWNER until final acceptance has <br /> l been received from the various Regulatory Agencies having jurisdiction . <br /> B . Contractor shall furnish sufficient labor , construction equipment and materials , and work <br /> i <br /> such hours , including night shifts and overtime operations , as may be necessary to <br /> insure the prosecution of the work in accordance with the approved progress schedule . <br /> If, in the opinion of the ENGINEER , the CONTRACTOR falls behind the progress <br /> schedule , take such steps as may be necessary to improve progress , all without <br /> additional cost to the OWNER . The ENGINEER shall be compensated for his overtime <br /> E, services in accordance with the Supplementary Conditions , SC -6 . 02 . <br /> C . All salvageable material and equipment , for which specific use , relocation or other <br /> disposal is not specifically noted , shall remain the property of the OWNER and shall be <br /> delivered to the OWNER at the following location : 4550 41St Street , at the <br /> CONTRACTOR ' s expense , All material and equipment not in salvageable condition , as <br /> determined by the ENGINEER and the OWNER , shall be disposed of by the <br /> CONTRACTOR , at the CONTRACTOR ' s expense . <br /> IF <br /> D . In addition to these Specifications all work must comply with the requirements of the <br /> local governing agency , St . Johns River Water Management District , Department of <br /> Environmental Protection , Army Corps of Engineers , Indian River Farms Water Control <br /> District , and all other applicable State or Federal agencies ' specifications and permits , <br /> In the event of a conflict , the more stringent specification or requirement shall govern . <br /> E . Before performing any work outside the designated limits of the work site Contractor <br /> r tactor <br /> shall secure any necessary permits and authorization from the applicable owner , or <br /> verify in writing that such has been previously obtained . Follow all requirements of any <br /> said permits or authorization . Give the ENGINEER and appropriate owner ten ( 10 ) days <br /> minimum notice before commencing construction operations outside the designated <br /> limits of the work site . <br /> 010 09 ,,, 1 - <br /> 09 1 01009 Special Provisions <br /> F : \Public Works\ENGINEERING DIVISION PROJECTS\0517-OSLO ROAD_43rd Ave to 58th Ave-Phase III \Admim\bid documents\01009 - Special <br /> Provisions . doc <br /> Ir'; , <br /> I IF IF er <br /> IF <br /> IF <br /> FK <br /> IF IF F <br /> FFF <br />