Laserfiche WebLink
IT I <br /> ' '" r x <br /> 1 # g i f <br /> �' -fir x� cre . - k� �s 'a: tkr"e�, n z ff Y ,& ' t. - ��. . �.. • � :r` gs°way& <br /> z <br /> a <br /> OWNER in writing (with a copy to CONTRACTOR) of dispute resolution costs ) sustained by <br /> ENGINEER's findings and conclusions . CONTRACTOR on or in connection with any <br /> other project or anticipated project . <br /> C . Possible Price and Times Adjustments <br /> 4 . 04 Underground Facilities <br /> 1 . The Contract Price or the Contract <br /> Times , or both , will be equitably adjusted to the A . Shown or Indicated: The information and data <br /> extent that the existence of such differing shown or indicated in the Contract Documents with <br /> subsurface or physical condition causes an in respect to existing Underground Facilities at or <br /> crease or decrease in CONTRACTOR's cost contiguous to the Site is based on information <br /> and <br /> of, or time required for, performance of the data furnished to OWNER or ENGINEER by the <br /> Work ; subject , however , to the following : owners of such Underground Facilities , including <br /> OWNER , or by others . Unless it is otherwise <br /> a , such condition must meet any one or expressly provided in the Supplementary Conditions : <br /> more of the categories described in para- <br /> graph 4 . 03 .A; and 1 . OWNER and ENGINEER shall not <br /> be responsible for the accuracy or com - <br /> b . with respect to Work that is paid for pleteness of any such information or data ; and <br /> i on a Unit Price Basis , any adjustment in <br /> Contract Price will be subject to the 20 the cost of all of the following will be <br /> provisions of paragraphs 9 . 08 and 11 . 03 . included in the Contract Price , and CONTRAC- <br /> T TOR shall have full responsibility for : <br /> 2 . CONTRACTOR shall not be entitled <br /> to any adjustment in the Contract Price or a , reviewing and checking all such <br /> Contract Times if: information and data , <br /> a . CONTRACTOR knew of the b . locating all Underground Facilities <br /> existence of such conditions at the time shown or indicated in the Contract <br /> CONTRACTOR made a final commitment Documents , <br /> to OWNER in respect of Contract Price and <br /> Contract Times by the submission of a Bid c . coordination of the Work with the <br /> or becoming bound under a negotiated owners of such Underground Facilities , <br /> contract; or including OWNER , during construction , and <br /> b , the existence of such condition could d , the safety and protection of all such <br /> reasonably have been discovered or Underground Facilities and repairing any <br /> revealed as a result of any examination , damage thereto resulting from the Work , <br /> investigation , exploration , test, or study of <br /> the Site and contiguous areas required by B . Not Shown or Indicated <br /> the Bidding Requirements or Contract <br /> Documents to be conducted by or for CON - 1 . If an Underground Facility is <br /> TRACTOR prior to CONTRACTOR's uncovered or revealed at or contiguous to the <br /> making such final commitment; or Site which was not shown or indicated , or not <br /> shown or indicated with reasonable accuracy in <br /> c . CONTRACTOR failed to give the the Contract Documents , CONTRACTOR shall , <br /> written notice within the time and as re- promptly after becoming aware thereof and <br /> quired by paragraph 4 . 03 .A. before further disturbing conditions affected <br /> thereby or performing any Work in connection <br /> 3 . If OWNER and CONTRACTOR are therewith (except in an emergency as required <br /> unable to agree on entitlement to or on the by paragraph 6 . 16 .A) , identify the owner of <br /> amount or extent , if any, of any adjustment in such Underground Facility and give written <br /> the Contract Price or Contract Times , or both , a notice to that owner and to OWNER and ENGI - <br /> Claim may be made therefor as provided in NEER . ENGINEER will promptly review the <br /> paragraph 10 . 05 . However , OWNER, Underground Facility and determine the extent, <br /> ENGINEER , and ENGINEER's Consultants if any, to which a change is required in the <br /> shall not be liable to CONTRACTOR for any Contract Documents to reflect and document <br /> claims , costs , losses , or damages ( including the consequences of the existence or location <br /> but not limited to all fees and charges of of the Underground Facility. During such time , <br /> ° engineers , architects , attorneys , and other CONTRACTOR shall be responsible for the <br /> professionals and all court or arbitration or other <br /> 00700 - Geneial Conditions REV 04-07 .doc <br /> 00700 - 12 <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0517-OSLO ROAD 43rd Ave to 58th Ave-Phase III\Admim\bid documents\00700 - General Conditions REV 04-07 <br />.doc <br /> tIT <br /> .. .. f . _. . _ - _ . . , . ... „ . . , . . , .., <br />