My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-101A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-101A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2015 1:31:44 PM
Creation date
10/1/2015 4:28:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/22/2012
Control Number
2012-101A
Agenda Item Number
12.I.1
Entity Name
Timothy Rose Contracting
Subject
Contract Documents and Specifications
Oslo Road Phase 111 Roadway Improvements
Area
58th Avenue and 43rd Avenue
Project Number
0517
Bid Number
2012036
Supplemental fields
SmeadsoftID
11224
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to <br /> A <br /> t $ . '' " 1 + % 4 f <br /> , r `---------------------- <br /> , ,: It <br /> � . .,, z 'r-i• �� ' ` '?„ � e. „� , ;1` j;i� - <br /> 2 . 07 as it may be adjusted from time to time as <br /> to <br /> provided below . b . CONTRACTOR certifies that : ( i ) <br /> there is no increase in cost to the OWNER ; <br /> 1 . CONTRACTOR shall submit to and ( ii ) it will conform substantially, even <br /> ENGINEER for acceptance (to the extent indi- with deviations , to the detailed requirements <br /> cated in paragraph 2 . 07 ) proposed adjustments of the item named in the Contract <br /> in the progress schedule that will not result in Documents . <br /> changing the Contract Times (or Milestones ) . <br /> Such adjustments will conform generally to the 2 . Substitute Items <br /> too progress schedule then in effect and additional - <br /> ly will comply with any provisions of the General a . If in ENGINEER's sole discretion an <br /> Requirements applicable thereto , item of material or equipment proposed by <br /> AI CONTRACTOR does not qualify as an <br /> 2 . Proposed adjustments in the it item under paragraph 6 . 05 .A. 1 , it <br /> progress schedule that will change the Contract will be considered a proposed substitute <br /> Times (or Milestones ) shall be submitted in item , <br /> accordance with the requirements of Article 12 . <br /> = Such adjustments may only be made by a b . CONTRACTOR shall submit suffi- <br /> Change Order or Written Amendment in accor- cient information as provided below to allow <br /> dance with Article 12 . ENGINEER to determine that the item of <br /> material or equipment proposed is <br /> 411 % 6 . 05 Substitutes and "Or-Equals " essentially equivalent to that named and an <br /> acceptable substitute therefor. Requests for <br /> A. Whenever an item of material or equipment is review of proposed substitute items of <br /> specified or described in the Contract Documents by material or equipment will not be accepted <br /> using the name of a proprietary item or the name of a by ENGINEER from anyone other than <br /> 41 <br /> to particular Supplier, the specification or description is CONTRACTOR , <br /> intended to establish the type , function , appearance , <br /> and quality required . Unless the specification or c . The procedure for review by ENGI - <br /> description contains or is followed by words reading NEER will be as set forth in paragraph <br /> that no like , equivalent, or it item or no 6 . 05 .A. 2 . d , as supplemented in the General <br /> substitution is permitted , other items of material or Requirements and as ENGINEER may <br /> equipment or material or equipment of other Suppliers decide is appropriate under the <br /> may be submitted to ENGINEER for review under the circumstances , <br /> circumstances described below. <br /> d . CONTRACTOR shall first make <br /> 1 . "Or-Equal" Items: If in ENGINEER's written application to ENGINEER for review <br /> sole discretion an item of material or equipment of a proposed substitute item of material or <br /> proposed by CONTRACTOR is functionally equipment that CONTRACTOR seeks to <br /> equal to that named and sufficiently similar so furnish or use . The application shall certify <br /> that no change in related Work will be required , that the proposed substitute item will <br /> it may be considered by ENGINEER as an perform adequately the functions and <br /> "or-equal" item , in which case review and achieve the results called for by the general <br /> approval of the proposed item may, in design , be similar in substance to that <br /> ENGINEER's sole discretion , be accomplished specified , and be suited to the same use as <br /> without compliance with some or all of the that specified . The application will state the <br /> requirements for approval of proposed substi - extent , if any, to which the use of the <br /> pro- <br /> tute items . For the purposes of this paragraph posed substitute item will prejudice <br /> 6 . 05 .A . 1 , a proposed item of material or CONTRACTOR's achievement of Substan - <br /> equipment will be considered functionally equal tial Completion on time , whether or not use <br /> to an item so named if: of the proposed substitute item in the Work 4 ll <br /> will require a change in any of the Contract <br /> a . in the exercise of reasonable Documents (or in the provisions of any other <br /> judgment ENGINEER determines that : ( i ) it direct contract with OWNER for work on the <br /> 44 is at least equal in quality, durability, Project ) to adapt the design to the proposed <br /> appearance , strength , and design substitute item and whether or not <br /> characteristics ; ( ii ) it will reliably perform at incorporation or use of the proposed substi- <br /> least equally well the function imposed by tute item in connection with the Work is sub- <br /> the design concept of the completed Project ject to payment of any license fee or royalty, <br /> as a functioning whole , and ; All variations of the proposed substitute <br /> 00700 - General Conditions REV 04-07 . doc <br /> 00700 — 19 <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0517-OSLO ROAD 43rd Ave to 58th Ave-Phase III\Admin bid documents\00700 - General Conditions REV <br /> 04-07 .doc <br /> mm to Ir <br /> _ , . , � . .w . . . - , <br />
The URL can be used to link to this page
Your browser does not support the video tag.