ele
<br /> Iv
<br /> ,� � , � ,;.,�. '� ,� , 3x �,r,3 it :, �-�r r .: '+t; , t� i aaF �.sd,,
<br /> installation requirements , materials , catalog technique , sequence , or procedure of I
<br /> numbers , and similar information with struction is specifically and expressly called for
<br /> respect thereto ; by the Contract Documents ) or to safety
<br /> precautions or programs incident thereto . The
<br /> b , all materials with respect to intended review and approval of a separate item as such
<br /> use , fabrication , shipping , handling , storage , will not indicate approval of the assembly in
<br /> assembly, and installation pertaining to the which the item functions .
<br /> performance of the Work ;
<br /> 3 . ENGINEER's review and approval of
<br /> c , all information relative to means , Shop Drawings or Samples shall not relieve
<br /> methods , techniques , sequences , and CONTRACTOR from responsibility for any
<br /> procedures of construction and safety variation from the requirements of the Contract
<br /> precautions and programs incident thereto ; Documents unless CONTRACTOR has in
<br /> and writing called ENGINEER's attention to each
<br /> such variation at the time of each submittal as
<br /> d . CONTRACTOR shall also have required by paragraph 6 . 17 . D . 3 and ENGI .
<br /> reviewed and coordinated each Shop NEER has given written approval of each such
<br /> Drawing or Sample with other Shop variation by specific written notation thereof
<br /> Drawings and Samples and with the incorporated in or accompanying the Shop
<br /> requirements of the Work and the Contract Drawing or Sample approval ; nor will any
<br /> Documents , approval by ENGINEER relieve CON -
<br /> TRACTOR from responsibility for complying
<br /> 2 . Each submittal shall bear a stamp or with the requirements of paragraph 6 . 17 . D . 1 .
<br /> specific written indication that CONTRACTOR
<br /> has satisfied CONTRACTOR's obligations F . Resubmittal Procedures
<br /> under the Contract Documents with respect to
<br /> CONTRACTOR's review and approval of that 1 . CONTRACTOR shall make correc-
<br /> submittal . tions required by ENGINEER and shall return
<br /> the required number of corrected copies of
<br /> 3 . At the time of each submittal , CON - Shop Drawings and submit as required new
<br /> TRACTOR shall give ENGINEER specific Samples for review and approval . CON -
<br /> written notice of such variations , if any, that the TRACTOR shall direct specific attention in
<br /> Shop Drawing or Sample submitted may have writing to revisions other than the corrections
<br /> from the requirements of the Contract called for by ENGINEER on previous
<br /> Documents , such notice to be in a written I submittals ,
<br /> munication separate from the submittal ; and , in
<br /> addition , shall cause a specific notation to be 6 . 18 Continuing the Work
<br /> made on each Shop Drawing and Sample sub-
<br /> mitted to ENGINEER for review and approval of A. CONTRACTOR shall carry on the Work and
<br /> each such variation . adhere to the progress schedule during all disputes or
<br /> disagreements with OWNER . No Work shall be
<br /> E . ENGINEER 's Review delayed or postponed pending resolution of any
<br /> disputes or disagreements , except as permitted by
<br /> 1 . ENGINEER will timely review and paragraph 15 . 04 or as OWNER and CONTRACTOR
<br /> approve Shop Drawings and Samples in may otherwise agree in writing ,
<br /> accordance with the schedule of Shop
<br /> Drawings and Sample submittals acceptable to 6 . 19 CONTRACTOR 's General Warranty and
<br /> ENGINEER . ENGINEER's review and Guarantee
<br /> approval will be only to determine if the items
<br /> covered by the submittals will , after installation A. CONTRACTOR warrants and guarantees to
<br /> or incorporation in the Work , conform to the OWNER, ENGINEER, and ENGINEER's Consultants
<br /> information given in the Contract Documents that all Work will be in accordance with the Contract
<br /> and be compatible with the design concept of Documents and will not be defective .
<br /> the completed Project as a functioning whole as CONTRACTOR's warranty and guarantee hereunder
<br /> indicated by the Contract Documents , excludes defects or damage caused by:
<br /> 2 . ENGINEER's review and approval 1 . abuse , modification , or improper
<br /> will not extend to means , methods , techniques , maintenance or operation by persons other
<br /> sequences , or procedures of construction than CONTRACTOR , Subcontractors ,
<br /> (except where a particular means , method ,
<br /> 00700 - General Conditions REV 04-07 .doc
<br /> 00700 - 24
<br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0517-OSLO ROAD 43rd Ave to 58th Ave-Phase III\Admim\bid documents\00700 - General Conditions REV 04-07
<br />. doc
<br /> Lee
<br /> Lee
<br /> ell IL L
<br /> ,. _ _ . f , . . . , . . . , .
<br />
|