My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-101A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-101A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2015 1:31:44 PM
Creation date
10/1/2015 4:28:13 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
05/22/2012
Control Number
2012-101A
Agenda Item Number
12.I.1
Entity Name
Timothy Rose Contracting
Subject
Contract Documents and Specifications
Oslo Road Phase 111 Roadway Improvements
Area
58th Avenue and 43rd Avenue
Project Number
0517
Bid Number
2012036
Supplemental fields
SmeadsoftID
11224
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AI A 11 A <br /> r ; _AA ,_ <br /> AY <br /> , <br /> 4 AA <br /> II <br /> A Al <br /> SC -2 . 06 Preconstruction Conference <br /> SC-2 . 06 Delete paragraph GC- 2. 06. A in its entirety and insert the following paragraph in its <br /> place: <br /> A . Immediately after awarding the contract , but before the CONTRACTOR begins <br /> work , the Construction Coordination Manager will call a preconstruction <br /> conference at a place the ENGINEER designates to establish an understanding <br /> among the parties as to the work and to discuss schedules referred to in <br /> paragraph 2 . 05 . 13 , procedures for handling Shop Drawings and other submittals , <br /> and maintaining required records . Utility companies and others as appropriate <br /> will be requested to attend to discuss and coordinate work . <br /> SC -3 . 06 Coordination of Plans , Specifications , and Special Provisions <br /> SC -3 . 06 Add the following new paragraphs immediately after paragraph GC-3. 05: <br /> SC -3 . 06 Coordination of Plans, Specifications, and Special Provisions <br /> A . In case of discrepancy , the governing order of the documents shall be as follows : <br /> 1 . Written Interpretations <br /> 2 , Addenda <br /> 3 . Specifications <br /> 4 . Supplementary Conditions to the General Conditions <br /> 5 , General Conditions <br /> a <br /> 6 . Approved Shop Drawings <br /> 7 . Drawings <br /> 8 . Referenced Standards , <br /> B . Written/computed dimensions shall govern over scaled dimensions . <br /> SC -4 . 02 Subsurface and Physical Conditions <br /> SC-4 . 02 Add the following new paragraphs immediately after paragraph GC4. 02. 8 : <br /> C . In the preparation of Drawings and Specifications , ENGINEER or ENGINEER ' s <br /> Consultants relied upon the following reports of explorations and tests of <br /> subsurface conditions at the Site : <br /> Roadway Soil Survey — Oslo Road Improvements Project from 58th Avenue to <br /> 43rd Avenue . <br /> D . Reports and drawings itemized in SC-4 . 02 . 0 are included with the Bidding <br /> Documents and are located before Appendix "A" . <br /> SC -5 . 01 Performance , Payment and Other Bonds <br /> SC -5 . 01 . A . Delete paragraph GC- 5. 01 . A in its entirety and insert the following paragraphs in its <br /> place: <br /> Within ten ( 10 ) days of receipt of the Contract Documents for execution , the <br /> CONTRACTOR shall furnish a Public Construction Bond in an amount <br /> equal to 100 % of the Contract Price , <br /> 00800-2 <br /> 00800 - Supplementary Conditions 06-09 rev . doc <br /> 00800 2F \Public Works\ENGINEERING DIVISION PROJECTS\0517-OSLO ROAD 43rd Ave to 58th Ave-Phase III\Admine bid documents\00800 - Supplementary <br /> Conditions 06-09 rev. doc <br /> Ir• � . „ ;� .. , .. _ . . <br />
The URL can be used to link to this page
Your browser does not support the video tag.