Addendum No . 1 <br /> April 23 , 2012 <br /> Bid No : 2012036 <br /> 10 . A Pay Item 102 - 1A has been added to cover the Temporary Pavement for MOT . <br /> Temporary pavement will be required west of 58th Avenue . Please refer to the <br /> revised plan sheets CP1A , CP1 and CP2 for Typical Section and Plan View of the <br /> Temporary Pavement . <br /> 11 . The Miami Curb Detail on plan sheet 5 of 69 has been revised to state expansion <br /> joints at all inlets , at all radius points and construction joints at 10 ' intervals . Please <br /> refer to FDOT Specification 520-6 for further details . <br /> 12 . Electronic files are not available for download during the bidding phase , but they will <br /> be available for the contractor awarded the bid prior to the start of construction . <br /> 13 . Pay Item 110 -3 under Bridge Improvements includes the removal of the supporting <br /> pile caps and piles of the existing aerial water main and Pay Item 500 - 1 is to <br /> include the cost of placing the existing water main on the proposed brackets . <br /> 14 . The existing aerial water main will remain in service therefore we do not anticipate <br /> any bacteriological testing needed . Please refer to plan sheet 13 - 5 . <br /> 15 . The FC- 12 . 5 at 1 . 75 " thick is an erroneous note sheet 13 -28 on the Bridge <br /> Plans . <br /> The asphalt placed on the bridge will be structural course and will be placed <br /> according to the plan and profile , cross-sections within the Roadway Plans . <br /> 16 . IRC has no record of the thickness of the existing asphalt within the roadway or <br /> over the bridge . Core samples were not performed within the corridor. <br /> 17 . During the construction of the drainage laterals under the existing pavement the <br /> contractor will be responsible to maintain at least one lane of vehicular traffic with a <br /> flagman to facilitate a smooth traffic flow. The cost of this should be included under <br /> Pay Item 102 - 1 Maintenance of Traffic . <br /> i <br /> 18 . The excavation , soil amendment within the planting bed area should be included <br /> with the unit price of the individual pay items under LANDSCAPING in the Itemized <br /> Bid Schedule . The contractor may utilize in situ soil within the landscape area if the <br /> materials are suitable and meets FDOT Specification 580 . <br /> 19 . The area east of Station 99 + 00 is to be milled and resurfaced 1 " with Type SP 9 . 5 . <br /> 20 . It will be the responsibility of the CONTRACTOR to locate all existing utilities prior <br /> to construction . Please refer to General Note 34 , on plan sheet 4 of 69 . We have <br /> not potholed the gas line . <br /> 21 . The overhead power line will be relocated by FPL in a timely manner. <br /> Page 3 of 4 <br /> F: I Public Worksl ENGINEERING DIVISION PROJECTS10517-OSLO ROAD_43rd A ve to 58th Ave-Phase 1111 Admim l bid <br /> documentslAddendumslAddendum No. 1 04-23-12.doc <br />