Laserfiche WebLink
ENGINEER's sole discretion , be accomplished perform adequately the functions and <br /> without compliance with some or all of the achieve the results called for by the general <br /> requirements for approval of proposed substi- design , be similar in substance to that <br /> tute items. For the purposes of this paragraph specified , and be suited to the same use as <br /> 6. 05.A. 11 a proposed item of material or that specified . The application will state the <br /> equipment will be considered functionally equal extent, if any, to which the use of the pro- <br /> to an item so named if: posed substitute item will prejudice <br /> CONTRACTOR's achievement of Substan- <br /> a . in the exercise of reasonable tial Completion on time, whether or not use <br /> judgment ENGINEER determines that: (i) it of the proposed substitute item in the Work <br /> is at least equal in quality, durability, will require a change in any of the Contract <br /> appearance, strength , and design Documents (or in the provisions of any other <br /> characteristics; (ii) it will reliably perform at direct contract with OWNER for work on the <br /> least equally well the function imposed by Project) to adapt the design to the proposed <br /> the design concept of the completed Project substitute item and whether or not <br /> as a functioning whole, and ; incorporation or use of the proposed substi- <br /> tute item in connection with the Work is sub- <br /> b. CONTRACTOR certifies that: (i) ject to payment of any license fee or royalty. <br /> there is no increase in cost to the OWNER ; All variations of the proposed substitute <br /> and (ii) it will conform substantially, even item from that specified will be identified in <br /> with deviations, to the detailed requirements the application , and available engineering , <br /> of the item named in the Contract sales, maintenance, repair, and <br /> Documents. replacement services will be indicated . The <br /> application will also contain an itemized esti- <br /> 2 . Substitute Items mate of all costs or credits that will result <br /> directly or indirectly from use . of such <br /> a. If in ENGINEER's sole discretion an substitute item , including costs of redesign <br /> item of material or equipment proposed by and claims of other contractors affected by <br /> CONTRACTOR does not qualify as an any resulting change, all of which will be <br /> Is item under paragraph 6 . 05.A. 11 it considered by ENGINEER in evaluating the <br /> will be considered a proposed substitute proposed substitute item . ENGINEER may <br /> item . require CONTRACTOR to furnish additional <br /> data about the proposed substitute item . <br /> b. CONTRACTOR shall submit suffi- <br /> tient information as provided below to allow B . Substitute Construction Methods or Proce- <br /> ENGINEER to determine that the item of duces: If a specific means, method , technique, se- <br /> material or equipment proposed is quence, or procedure of construction is shown or <br /> essentially equivalent to that named and an indicated in and expressly required by the Contract <br /> acceptable substitute therefor. Requests for Documents, CONTRACTOR may furnish or utilize a <br /> review of proposed substitute items of substitute means, method , technique, sequence, or <br /> material or equipment will not be accepted procedure of construction approved by ENGINEER . <br /> by ENGINEER from anyone other than CONTRACTOR shall submit sufficient information to <br /> CONTRACTOR. allow ENGINEER, in ENGINEER's sole discretion , to <br /> determine that the substitute proposed is equivalent to <br /> c. The procedure for review by ENGI - that expressly called for by the Contract Documents. <br /> NEER will be as set forth in paragraph The procedure for review by ENGINEER will be similar <br /> 6. 05.A. 2 . d , as supplemented in the General to that provided in subparagraph 6. 05 .A.2 . <br /> Requirements and as ENGINEER may <br /> decide is appropriate under the C . Engineer's Evaluation: ENGINEER will be <br /> circumstances. allowed a reasonable time within which to evaluate <br /> each proposal or submittal made pursuant to para- <br /> d . CONTRACTOR shall first make graphs 6 . 05.A and 6. 05 . 13. ENGINEER will be the <br /> written application to ENGINEER for review sole judge of acceptability. No 'br-equal" or substitute <br /> of a proposed substitute item of material or will be ordered , installed or utilized until ENGINEER's <br /> equipment that CONTRACTOR seeks to review is complete, which will be evidenced by either a <br /> furnish or use. The application shall certify Change Order for a substitute or an approved Shop <br /> that the proposed substitute item will Drawing for an "or equal . " ENGINEER will advise <br /> 00700 - General Conditions REV 04-07.doc <br /> 00700 - 20 <br /> FAIDublic Works%ENGINEERING DIVISION PROJECTS11102-Old Dixie Hwy Swk 6th St to SR 60-LAMAdmimlbid documents\Master Contract Documents100700 - General Conditions <br /> REV <br /> 04m07.doc <br />