My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-204A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-204A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:24:25 AM
Creation date
10/1/2015 4:48:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2012
Control Number
2012-204A
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents Specifications
Federal Aid Project FM #425710-1-28-01
Area
Old Dixie Highway 8th St. to SR 60
Project Number
1102
Supplemental fields
SmeadsoftID
11622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
authority and limitations thereon of any such Resident provided in paragraph 13 . 04 , whether or not the Work <br /> Project Representative and assistants will be as is fabricated , installed , or completed . <br /> provided in paragraph 9 . 10 and in the Supplementary <br /> Conditions. If OWNER designates another represen- 9 . 07 Shop Drawings, Change Orders and <br /> tative or agent to represent OWNER at the Site who is Payments <br /> not ENGINEER's Consultant, agent or employee, the <br /> responsibilities and authority and limitations thereon of A. In connection with ENGINEER's authority as <br /> such other individual or entity will be as provided in the to Shop Drawings and Samples, see paragraph 6 . 17. <br /> Supplementary Conditions. <br /> B. In connection with ENGINEER's authority as <br /> 9 . 04 Clarifications and Interpretations to Change Orders, see Articles 101 11 , and 12 . <br /> A. ENGINEER will issue with reasonable C . In connection with ENGINEER's authority as <br /> promptness such written clarifications or interpreta- to Applications for Payment, see Article 14 . <br /> tions of the requirements of the Contract Documents <br /> as ENGINEER may determine necessary, which shall 9. 08 Determinations for Unit Price Work <br /> be consistent with the intent of and reasonably <br /> inferable from the Contract Documents. Such written A. ENGINEER will determine the actual quanti- <br /> clarifications and interpretations will be binding on ties and classifications of Unit Price Work performed <br /> OWNER and CONTRACTOR . If OWNER and CON- by CONTRACTOR. ENGINEER will review with <br /> TRACTOR are unable to agree on entitlement to or on CONTRACTOR the ENGINEER's preliminary <br /> the amount or extent, if any, of any adjustment in the determinations on such matters before rendering <br /> a <br /> Contract Price or Contract Times, or both , that should written decision thereon ( by recommendation of an <br /> vbe allowed as a result of a written clarification or Application for Payment or otherwise) . ENGINEER's <br /> interpretation , a Claim may be made therefor as written decision thereon will be final and binding <br /> provided in paragraph 10 . 05 . (except as modified by ENGINEER to reflect changed <br /> factual conditions or more accurate data) upon <br /> 9.05 Authorized Variations in Work OWNER and CONTRACTOR, subject to the <br /> provisions of paragraph 10. 05 . <br /> A. ENGINEER may authorize minor variations in <br /> the Work from the requirements of the Contract 9 . 09 Decisions on Requirements of Contract <br /> Documents which do not involve an adjustment in the Documents and Acceptability of Work <br /> Contract Price or the Contract Times and are compati- <br /> ble with the design concept of the completed Project A. ENGINEER will be the initial interpreter of the <br /> as a functioning whole as indicated by the Contract requirements of the Contract Documents and judge of <br /> Documents. These may be accomplished by a Field the acceptability of the Work thereunder. Claims, <br /> Order and will be binding on OWNER and also on disputes and other matters relating to the acceptability <br /> CONTRACTOR, who shall perform the Work involved of the Work, the quantities and classifications of Unit <br /> promptly. If OWNER and CONTRACTOR are unable Price Work, the interpretation of the requirements of <br /> to agree on entitlement to or on the amount or extent, the Contract Documents pertaining to the <br /> if any, of any adjustment in the Contract Price or performance of the Work, and Claims seeking <br /> Contract Times, or both , as a result of a Field Order, changes in the Contract Price or Contract Times <br /> will <br /> a Claim may be made therefor as provided in be referred initially to ENGINEER in writing , in <br /> paragraph 10 . 05. accordance with the provisions of paragraph 10. 05, <br /> with a request for a formal decision . <br /> 9. 06 Rejecting Defective Work <br /> B. When functioning as interpreter and judge <br /> A. ENGINEER will have authority to disapprove under this paragraph 9 . 09, ENGINEER will not show <br /> or reject Work which ENGINEER believes to be partiality to OWNER or CONTRACTOR and will not <br /> defective, or that ENGINEER believes will not produce be liable in connection with any interpretation or <br /> a completed Project that conforms to the Contract decision rendered in good faith in such capacity. The <br /> Documents or that will prejudice the integrity of the rendering of a decision by ENGINEER pursuant to this <br /> design concept of the completed Project as a paragraph 9 . 09 with respect to any such Claim , <br /> functioning whole as indicated by the Contract dispute, or other matter (except any which have been <br /> Documents. ENGINEER will also have authority to waived by the making or acceptance of final payment <br /> require special inspection or testing of the Work as as provided in paragraph 14. 07) will be <br /> a condition <br /> precedent to any exercise by OWNER or <br /> 00700 - General Conditions REV 04-07.doc <br /> 00700 - 29 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTSN 102-Old Dixie Hwy Swk 8th St to SR 60-LAP\Admim\bid documents\Master Contract Documents\00700 - General Conditions <br /> REV <br /> 04-07. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.