My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-204A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-204A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:24:25 AM
Creation date
10/1/2015 4:48:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2012
Control Number
2012-204A
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents Specifications
Federal Aid Project FM #425710-1-28-01
Area
Old Dixie Highway 8th St. to SR 60
Project Number
1102
Supplemental fields
SmeadsoftID
11622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br /> No . <br /> EFFECTIVE DATE : <br /> DATE OF ISSUANCE : <br /> OWNER: Indian River County <br /> CONTRACTOR: <br /> Contract: <br /> Project: Old Dixie Highway Sidewalk Improvements from 8t' St . to S . R. 60 <br /> OWNER's Contract No . 1102 Bid No. 2012052 <br /> ENGINEER: Indian River County Engineering Division FM #425710- 1 -58-01 <br /> You are directed to proceed promptly with the following changes : <br /> Description : <br /> Purpose of Work Change Directive : <br /> Attachments : (List documents supporting change) <br /> If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br /> Claim for a Change Order based thereon will involve one or more of the following methods as <br /> defined in the Contract Documents . <br /> Method of determining change in Method of determining change in <br /> Contract Prices: Contract Times <br /> II Unit Prices II Contractor's Records <br /> II Lump Sum F Engineer's Records <br /> F1 Other: II Other: <br /> 13 By Change Order: II By Change Order: <br /> Estimated increase (decrease) in Contract Price : Estimated increase (decrease) in Contract Times: <br /> $ Substantial Completion : days; <br /> Ready for Final Completion : days. <br /> If the change involves an increase, the estimated If the change involves an increase, the estimated <br /> amount is not to be exceeded without further time is not to be exceeded without further <br /> authorization . authorization . <br /> ACCEPTED : RECOMMENDED . APPROVED : <br /> By: By: By: <br /> CONTRACTOR ( Signature) ENGINEER (Signature) OWNER (Signature) <br /> Date : Date : Date : <br /> * * END OF SECTION <br /> FAIDublic Works\ENGINEERING DIVISION PROJECTS\1102-Old Dixie Hwy Swk 8th St to SR MLAPWdmim\bid <br /> documentsWlaster Contract Documents\00948 = Work Change Directive REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.