My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-204A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-204A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:24:25 AM
Creation date
10/1/2015 4:48:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2012
Control Number
2012-204A
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents Specifications
Federal Aid Project FM #425710-1-28-01
Area
Old Dixie Highway 8th St. to SR 60
Project Number
1102
Supplemental fields
SmeadsoftID
11622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br /> PROTECTION OF THE WORK AND PROPERTY <br /> 1 . 5 PROTECTION OF EXISTING STRUCTURES <br /> A . Underground Structures : <br /> 1 . Underground structures are defined to include , but not be limited to , all <br /> sewer, water, gas , and other piping , and manholes , chambers , electrical <br /> conduits , tunnels and other existing subsurface work located within or adja- <br /> cent to the limits of the Work . <br /> 2 . All underground structures known to ENGINEER except service <br /> connections for water, sewer, electric , and telephone are shown . This <br /> information is shown for the assistance of CONTRACTOR in accordance <br /> with the best information available , but is not guaranteed to be correct or <br /> complete . The existing utilities shown on the Contract Drawings are located <br /> according to the information available to the ENGINEER at the time the <br /> Drawings were prepared and have not been independently verified by the <br /> OWNER or the ENGINEER . Guarantee is not made that all existing <br /> underground utilities are shown or that the locations of those shown are <br /> accurate . The locations shown are for bidding purposes only . Finding the <br /> actual location of any existing utilities is the CONTRACTOR's responsibility <br /> and shall be done before it commences any work in the vicinity . <br /> Furthermore , the CONTRACTOR shall be fully responsible for any and all <br /> damages , which might be occasioned by the CONTRACTOR's failure to <br /> exactly locate and preserve any and all underground utilities . The OWNER <br /> or ENGINEER will assume no liability for any damages sustained or costs <br /> incurred because of the CONTRACTOR's operations in the vicinity of <br /> existing utilities or structures , nor for temporary bracing and shoring of <br /> same . If it is necessary to shore , brace , or swing a utility , contact the utility <br /> company or department affected and obtain their permission regarding the <br /> method to use for such work . <br /> 3 . Contact the various utility companies which may have buried or aerial <br /> utilities within or near the construction area before commencing work . <br /> Provide 48 hours minimum notice to all utility companies prior to beginning <br /> construction . <br /> 4 . Schedule and execute all work involving existing utilities in order to minimize <br /> necessary interruption of services . Whenever such interruption is <br /> necessary for completion of the work, notify the ENGINEER and the <br /> appropriate utility at least 48 hours in advance . Perform all work to <br /> repair/restore utility service to the satisfaction of the appropriate utility . <br /> Include all costs related to service maintenance , interruption , and <br /> restoration in the appropriate line item in the Contract. <br /> 5 . Where it is necessary to temporarily interrupt house or business services , <br /> the CONTRACTOR shall notify the owner or occupant, both before the <br /> interruption (24-hour minimum ) , and again immediately before service is <br /> resumed . Before disconnecting and pipes or cables , the CONTRACTOR <br /> shall obtain permission from their owner, or shall make suitable <br /> arrangement for their disconnection by their owner. <br /> 01541 -3 FAPublic WorksIENGINEERING DIVISION <br /> PROJECTS\1102-Old Dixie Hwy Swk 8th St to SR 60-LAP\Admim\bid documents\Master Contract <br /> Documents\01541 as Protection of Property. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.