My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-204A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-204A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:24:25 AM
Creation date
10/1/2015 4:48:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2012
Control Number
2012-204A
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents Specifications
Federal Aid Project FM #425710-1-28-01
Area
Old Dixie Highway 8th St. to SR 60
Project Number
1102
Supplemental fields
SmeadsoftID
11622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c . Samples , if appropriate . <br /> d . Name and address of similar projects on which product was used , <br /> and date of installation . <br /> 2 . For construction methods ( if specified ) : <br /> a . Detailed description of proposed method . <br /> b . Drawings illustrating method . <br /> 3 . Such other data as the ENGINEER may require to establish that the <br /> proposed substitution is equal to the product, manufacturer or method <br /> specified . <br /> C . In making Request for Substitution , CONTRACTOR represents that : <br /> 1 . CONTRACTOR has investigated proposed substitution , and deter- <br /> mined that it is equal to or superior in all respects to the product, <br /> manufacturer or method specified . <br /> 2 . CONTRACTOR will provide the same or better guarantees or <br /> warranties for proposed substitution as for product, manufacturer, or <br /> method specified . <br /> 3 . CONTRACTOR waives all claims for additional costs or extension of <br /> time related to a proposed substitution that subsequently may become <br /> apparent. <br /> D . A proposed substitution will not be accepted if: <br /> 1 . Acceptance will require changes in the design concept or a substantial <br /> revision of the Contract Documents . <br /> 2 . It will delay completion of the Work, or the work of other contractors . <br /> 3 . It is indicated or implied on a Shop Drawing and is not accompanied by <br /> a formal Request for Substitution from CONTRACTOR . <br /> E . If the ENGINEER determines that a proposed substitute is not equal to that <br /> specified , furnish the product, manufacturer, or method specified at no additional <br /> cost to OWNER . <br /> F . Approval of a substitution will not relieve CONTRACTOR from the requirement <br /> for submission of Shop Drawings as set forth in the Contract Documents . <br /> G . The procedure for review by Engineer will include the following : <br /> 1 . Requests for review of substitute items of material and equipment will <br /> not be accepted by Engineer from anyone other than CONTRACTOR . <br /> 2 . Upon receipt of an application for review of a substitution , Engineer will <br /> determine whether the review will be more extensive than a normal shop <br /> drawing review for the specified item . <br /> 01630-2 01630 Substitutions <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1102-01d Dixie Hwy Swk 8th St to SR 60-LAP\Admim\bid documents\Master <br /> Contract Documents\01630 as Substitutions.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.