My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-204A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-204A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:24:25 AM
Creation date
10/1/2015 4:48:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2012
Control Number
2012-204A
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents Specifications
Federal Aid Project FM #425710-1-28-01
Area
Old Dixie Highway 8th St. to SR 60
Project Number
1102
Supplemental fields
SmeadsoftID
11622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 102 = MAINTENANCE OF TRAFFIC <br /> The work specified in this item shall conform to Section 102 of the Florida Department of <br /> Transportation Standard Specifications for Road and Bridge Construction (2010 Edition ) , <br /> except as modified herein . <br /> A. GENERAL PROVISIONS-DESCRIPTION : The work specified in this Section consists <br /> of maintaining traffic within the limits of the project for the duration of the construction <br /> period , including any temporary suspensions of the work . It shall include the <br /> construction and maintenance of any necessary detour facilities ; the providing of <br /> necessary facilities for access to residences , businesses , etc . , along the project; the <br /> furnishing , installing and maintaining of traffic control and safety devices during <br /> construction , the control of dust through the use of calcium chloride if necessary, and <br /> any other special requirements for safe and expeditious movement of traffic as may be <br /> called for on the plans . The term , Maintenance of Traffic , as used herein , shall include <br /> all of such facilities , devices and operations as are required for the safety and <br /> convenience of the public as well as for minimizing public nuisance ; all as specified in <br /> this Itemized Section 14 of these provisions and Paragraph 24 in General Conditions <br /> Section . <br /> B . BEGINNING DATE OF CONTRACTOR'S RESPONSIBILITY: The Contractor shall <br /> present his Maintenance of Traffic Plan at the pre-construction conference . The <br /> Maintenance of Traffic Plan shall indicate the type and location of all signs , lights , <br /> barricades , striping and barriers to be used for the safe passage of pedestrians and <br /> vehicular traffic "through the project and for the protection of the workmen . The plan <br /> will indicate conditions and setups for each phase of the Contractor's activities . <br /> When the project plans include or specify a specific Maintenance of Traffic Plan , <br /> alternate proposals will be considered when they are found to be equal to or better <br /> than the plan specified . <br /> In no case may the Contractor begin work until the Maintenance of Traffic Plan has <br /> been approved in writing by the Engineer. Modifications to the Maintenance of Traffic <br /> Plan that become necessary shall also be approved in writing . Except in an <br /> emergency, no changes to the approved plan will be allowed until approval to change <br /> such plan has been received . <br /> The cost of all work included in the Maintenance of Traffic Plan shall be included in the <br /> pay item for Maintenance of Traffic. <br /> The Contractor shall be responsible for performing daily inspections , including <br /> weekends and holidays , with some inspections at nighttime , of the installations on the <br /> project and replace all equipment and devices not conforming with the approved <br /> standards during that inspection . The project personnel will be advised of the <br /> schedule of these inspections and be given the opportunity to join in the inspection as <br /> is deemed necessary . <br /> 01025- 2 Technical Specifications <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1102-Old Dixie Hwy Swk 8th St to SR 60-LAPWdmim\bid documentsWlaster <br /> Contract Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.