Laserfiche WebLink
G . Construction Site Egress Driveways : Minimize the transport of sediment and soil from <br /> the construction site or work area by vehicle wheels . Construct a crushed rock driving <br /> surface at the vehicle exit point(s) . Provide an area large enough to remove the <br /> sediment and soil from vehicle wheels before the vehicle leaves the construction site <br /> or work area . Provide wash-down stations as required to wash vehicle tires and retain <br /> all washwater on-site . Do not use limerock . <br /> H . Rock and Stone for Erosion Control and Pollution Control and Treatment: <br /> 1 . Crushed Limerock: Crushed limerock shall not be used under any <br /> circumstance . <br /> 2 . Acceptable Material : FDOT #4 non -calcareous aggregate (usually granite) , <br /> washed and meeting the requirements of FDOT Standard Specifications for <br /> Road and Bridge Construction , Section 901 . <br /> I . Hay Bales : Hay bales shall not be used . <br /> PART 3 - EXECUTION <br /> A . Design , construct, and maintain the pollution control and treatment system to minimize <br /> erosion and capture and remove pollutants from the construction site and from all <br /> other areas disturbed by construction activities . <br /> Be Apply polyacrylamide only as directed by the polyacrylamide manufacturer/supplier. <br /> Item of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item No . 104- 1 — Erosion & Water Pollution Control an Lump Sum <br /> [The remainder of this page was left blank intentionally] <br /> 01025- 10 Technical Specifications <br /> FAIDublic Works\ENGINEERING DIVISION PROJECTS\1102-Old Dixie Hwy Swk 8th St to SR 60-LAPWdmim\bid documents\Master <br /> Contract Documents\Technical Specifications.doc <br />