My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-204A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-204A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:24:25 AM
Creation date
10/1/2015 4:48:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2012
Control Number
2012-204A
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents Specifications
Federal Aid Project FM #425710-1-28-01
Area
Old Dixie Highway 8th St. to SR 60
Project Number
1102
Supplemental fields
SmeadsoftID
11622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> ITEMIZED BID SCHEDULE <br /> PROJECT NAME: OLD DIXIE HIGHWAY SIDEWALK IMPROVEMENTS FROM 8th ST. TO S.R. 60 <br /> DDER'S NAME : I -- PROJECT # 1102, BID NO. 2012052, FM#425710-58-01 <br /> 700-20-40 SINGLE SIGN POST RELOCATE AS 5 fTG'. 00 500100 <br /> 706-3 RETRO-REFLECTIVE PAVEMENT MARKERS EA 20 0 <br /> o <br /> o <br /> 711 -11 -123 THERMOPLASTIC STANDARD WHITE SOLID 12" LF 778 oC . y � <br /> JA <br /> 711 -11 -125 THERMOPLASTIC STANDARD WHITE SOLID 24" LF 87 jG0 4vo. ;,w <br /> 7. 11 -11 -221 THERMOPLASTIC STANDARD YELLOW SOLID 6" LF 500 • oZ0 !� DO , <br /> I <br /> SUB-TOTAL <br /> MISCELLANEOUS <br /> 800 PUBLIC CONSTRUCTION BOND LS 1 do b • � �� • a <br /> 801 TRENCH SAFETY COMPLIANCE OVER 5' SEE SEC. 00454 LS 1 <br /> 802 ITRENCH SAFETY COMPLIANCE SHORING SEE SEC. 00454 LS 1 66b, vo ✓r" D('� , <br /> MISCELLANEOUS SUB-TOTAL oZb. aZ <br /> FORCE ACCOUNT 301000.00 <br /> OVERALL PROJECT TOTAL � Z5 Jam' I go 3 <br /> TOTAL PROJECT BID INCLUDING FORCE ACCOUNT <br /> OLD DIXIE HIGHWAY SIDEWALK IMPROVEMENTS TOTAL 5 � . ? <br /> OTAL PROJECT BID AMOUNT IN WORDS vj R Vie, <br /> it `� <br /> v e tCU.viYLedt_ ak, e� h 3 `� � itr� naaS <br /> NOTE: IF THERE IS A DISCREPANCY BETWEEN THE PLANS (SUMMARY OF PAY ITEMS) <br /> AND THE ITEMIZED BID SCHEDULE, THE BID DOCUMENTS WILL GOVERN. <br /> AS = Assembly CY = Cubic Yard EA = Each LF = Linear Foot LS = Lump Sum <br /> SY = Square Yard TN = Ton <br /> r <br /> 00310-4 <br /> F:\Public Works\ENGINEERING DIVISION PROJECTS\1 1 02-Old Dixie Hwy Swk 8th St to SR 60-LAp\Admim\estimates\Old Dixie Highway Sidewalk 8th St to 20th <br /> R+ 9_7_ 19 vl¢ <br />
The URL can be used to link to this page
Your browser does not support the video tag.