My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-204A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-204A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:24:25 AM
Creation date
10/1/2015 4:48:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2012
Control Number
2012-204A
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents Specifications
Federal Aid Project FM #425710-1-28-01
Area
Old Dixie Highway 8th St. to SR 60
Project Number
1102
Supplemental fields
SmeadsoftID
11622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Instructions for Form. <br /> The contractor must provide enough information through a Schedule "A" spreadsheet to determine which pay-items) are <br /> being sublet, the amounts, and cost. For sublet calculations, the amount will be calculated based on the actual contract <br /> unit price(s) unless there is a partial sublet. For partial sublets, use the unit prices from the actual sub-contract. <br /> 1 ) Enter the Date of the certification of sublet work was prepared . <br /> 2) Enter the sequential number of the request starting with number 1 . <br /> 3) Enter the Federal Aid Project number for the Prime Contractor if any. <br /> 4) Enter the Financial Project Identification number of the Contract. <br /> 5) Enter the Contract number of the Contract with the Department. <br /> 6) Enter the County name where the work is being performed. <br /> 7) Enter the Name of the Prime Contractor. <br /> 8) Enter the FEID number of the Prime Contractor. <br /> 9 Enter the Original Contract dollar amount (round to nearest whole dollar). <br /> 10) Enter a "Y" in the space marked Change if any information on the line has changed since the <br /> previous certification of sublet work was prepared . Otherwise, leave blank. <br /> 11 ) Enter the Subcontractor names. Enter all the subcontractor(s) regardless of their tier. <br /> 12) Enter the tier number for the subcontractor. If the subcontractor works directly for the Prime <br /> Contractor, enter a "1 ". If he works one level below, enter a "2" and so on . <br /> 13) Enter the FEID number of the Subcontractor(s). <br /> 14) Enter the name of the pertinent Contractor or Subcontractor that hired subcontractor. <br /> 15) Enter a short description of the work to be performed . <br /> 16) Enter a "P" if any pay-item for the sublet is a partial sublet. <br /> 17) Enter the DBE status for the subcontractor. "D" for DBE , "N" for non-DBE . <br /> 18) The Department may require subcontractor to be prequalified with the Department as described <br /> in the Special Provisions and the Bid Solicitation Notice whenever construction projects contain <br /> certain classes of work that require specific expertise. <br /> 19) One ( 1 ) copy of this form shall be submitted to the District Office by the contractor. <br /> 20) To be signed by principal of the firm or someone with the delegated authority and notarized . <br /> 00500- 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.