Laserfiche WebLink
SECTION 00520 - Agreement ( Public Works ) <br /> THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br /> State of Florida organized and existing under the Laws of the State of Florida , (hereinafter called <br /> OWNER) <br /> and ��FtvvloAlku o <br /> (hereinafter called CO TRACTOR) . <br /> OWNER and CONTRACTOR , in consideration of the mutual covenants hereinafter set forth , <br /> agree as follows : <br /> ARTICLE 1 = WORK <br /> 1 . 01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br /> Documents , The Work is generally described as follows : <br /> The project will consist of the construction of a 5 ' wide concrete sidewalk and minor <br /> drainage modifications along the east side of Old Dixie Highway between 8T" St . and <br /> S . R . 60 , a length of approximately 1 . 5 miles . . <br /> ARTICLE 2 - THE PROJECT <br /> 2 . 01 The Project for which the Work under the Contract Documents may be the whole or only a <br /> part is generally described as follows : <br /> to <br /> Project Name : Old Dixie Highway Sidewalk Improvements from 8 St . to S . R . 60 <br /> J a vg <br /> County Project Number: 1102 <br /> Bid Number: 2012052 <br /> Project Address : Old Dixie Highway between 8th St . and S . R . 60 <br /> ARTICLE 3 — ENGINEER <br /> 3 . 01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br /> and will act as OWNER' s representative , assume all duties and responsibilities , and have <br /> the rights and authority assigned to ENGINEER in the Contract Documents in connection <br /> with the completion of the Work in accordance with the Contract Documents , <br /> ARTICLE 4 - CONTRACT TIMES <br /> 4 . 01 Time of the Essence <br /> A. All time limits for Milestones , if any , Substantial Completion , and completion and readiness <br /> for final payment as stated in the Contract Documents are of the essence of the Contract. <br /> 4 . 02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br /> A. The Work will be substantially completed on or before the 120th day after the date when <br /> the Contract Times commence to run as provided in paragraph 2 . 03 of the General <br /> Conditions , and completed and ready for final payment in accordance with paragraph <br /> 14 . 07 of the General Conditions on or before the 150th day after the date when the <br /> Contract Times commence to run . <br /> 00520 = Agreement (Public Works) REV 04-07 (7) <br /> 00520 - 2 <br /> Mocuments and Settings\mmclaughlin\Local Settings\Temporary Internet Files\Content.0utlook\24026LX8\00520 - Agreement (Public Works) REV 0447 (7).doc <br /> I - <br />