My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-204A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-204A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:24:25 AM
Creation date
10/1/2015 4:48:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2012
Control Number
2012-204A
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents Specifications
Federal Aid Project FM #425710-1-28-01
Area
Old Dixie Highway 8th St. to SR 60
Project Number
1102
Supplemental fields
SmeadsoftID
11622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00630 = Certificate of Substantial Completion <br /> Date of Issuance : 201 <br /> OWNER : Indian River County <br /> CONTRACTOR • <br /> Contract: <br /> Project : Old Dixie Highway Sidewalk Improvements from 8th St. to S . R . 60 <br /> Bid No . 2012052 <br /> ENGINEER's Project No . 1102 <br /> CONTRACT FOR : Old Dixie Highway Sidewalk Improvements from 81h St . to S . R . 60 <br /> This Certificate of Substantial Completion applies to all Work under the Contract Documents or <br /> to the following specified parts thereof: <br /> To <br /> OWNER <br /> And To <br /> CONTRACTOR <br /> The Work to which this Certificate applies has been inspected by authorized representatives of <br /> OWNER , CONTRACTOR and ENGINEER, and that Work is hereby declared to be <br /> substantially complete in accordance with the Contract Documents on <br /> DATE OF SUBSTANTIAL COMPLETION <br /> A tentative list of items to be completed or corrected is attached hereto . This list may not be alk <br /> inclusive , and the failure to include an item in it does not alter the responsibility of <br /> CONTRACTOR to complete all the Work in accordance with the Contract Documents . The <br /> items in the tentative list shall be completed or corrected by CONTRACTOR within days <br /> of the above date of Substantial Completion . <br /> 00630 - Certificate of Substantial Completion REV 04-07.doc <br /> 00630 = 1 <br /> FAPublic Works%ENGINEERING DIVISION PROJECTS11102-Old Dixie Hwy Swk 61h St to SR 60d.APWdmim\bid documentsXMaster Contract Documents\00630 - Certificate of <br /> Substantial Completion REV 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.