38 . Samples—Physical examples of steam , liquid petroleum products, telephone or other
<br /> materials, equipment, or workmanship that are communications, cable television , water, wastewater,
<br /> representative of some portion of the Work and which storm water, other liquids or chemicals , or traffic or
<br /> establish the standards by which such portion of the other control systems.
<br /> Work will be judged .
<br /> 47. Unit Price Work Work to be paid for on
<br /> 39 . Shop Drawings—All drawings, diagrams, the basis of unit prices.
<br /> illustrations, schedules, and other data or information
<br /> which are specifically prepared or assembled by or for 48. Work—The entire completed construction
<br /> CONTRACTOR and submitted by CONTRACTOR to or the various separately identifiable parts thereof re-
<br /> illustrate some portion of the Work. quired to be provided under the Contract Documents.
<br /> Work includes and is the result of performing or
<br /> 40. Site—Lands or areas indicated in the providing all labor, services, and documentation
<br /> Contract Documents as being furnished by OWNER necessary to produce such construction , and
<br /> upon which the Work is to be performed , including furnishing , installing , and incorporating all materials
<br /> rights-of-way and easements for access thereto, and and equipment into such construction , all as required .
<br /> such other lands furnished by OWNER which are by the Contract Documents.
<br /> designated for the use of CONTRACTOR .
<br /> 49. Work Change Direct ive—A written
<br /> 41 . Specifications—That part of the Contract statement to CONTRACTOR issued on or after the
<br /> Documents consisting of written technical descriptions Effective Date of the Agreement and signed by
<br /> of materials, equipment, systems, standards, and OWNER and recommended by ENGINEER ordering
<br /> workmanship as applied to the Work and certain an , addition , deletion , or revision in the Work, or
<br /> administrative details applicable thereto. responding to differing or unforeseen subsurface or
<br /> physical conditions under which the Work is to be
<br /> 42. Subcontractor—An individual or entity performed or to emergencies. A Work Change
<br /> having a direct contract with CONTRACTOR or with Directive will not change the Contract Price or
<br /> the
<br /> any other Subcontractor for the performance of a part Contract Times but is evidence that the parties expect
<br /> of the Work at the Site. that the change ordered or documented by a Work
<br /> Change Directive will be incorporated in a subse-
<br /> 43 . Substantial Completion—The time at quently issued Change Order following negotiations by
<br /> which the Work (or a specified part thereof) has the parties as to its effect, if any, on the Contract Price
<br /> progressed to the point where, in the opinion of or Contract Times.
<br /> ENGINEER, the Work (or a specified part thereof) is
<br /> sufficiently complete, in accordance with the Contract 50, Mitten Amendment—A written statement
<br /> Documents, so that the Work (or a specified part modifying the Contract Documents, signed by
<br /> thereof) can be utilized for the purposes for which it is OWNER and CONTRACTOR on or after the Effective
<br /> intended . The terms "substantially complete" and Date of the Agreement and normally dealing with the
<br /> substantially completed as applied to all or part of the nonengineenng or nontechnical rather than strictly
<br /> Work refer to Substantial Completion thereof. construction-related aspects of the Contract Docu-
<br /> ments.
<br /> 44 , Supplementary Conditions—That part of
<br /> the Contract Documents which amends or 1 . 02 Terminology
<br /> supplements these General Conditions.
<br /> A. Intent of Certain Terms or Adjectives
<br /> 45 . Supplier—A manufacturer, fabricator,
<br /> supplier, distributor, materialman , or vendor having a 1 . Whenever in the Contract Documents the
<br /> direct contract with CONTRACTOR or with any terms "as allowed , " "as approved , " or terms of like
<br /> Subcontractor to furnish materials or equipment to be effect or import are used , or the adjectives
<br /> incorporated in the Work by CONTRACTOR or any " reasonable, " "suitable," "acceptable, " "proper, "
<br /> Subcontractor. "satisfactory, " or adjectives of like effect or import
<br /> are used to describe an action or determination of
<br /> 46 . Underground Facilities—All underground ENGINEER as to the Work, it is intended that such
<br /> pipelines, conduits, ducts, cables, wires, manholes, action or determination will be solely to evaluate, in
<br /> vaults, tanks, tunnels , or other such facilities or general , the completed Work for compliance with
<br /> attachments, and any encasements containing such the requirements of and information in the Contract
<br /> facilities, including those that convey electricity, gases , Documents and conformance with the design
<br /> 00700 - General Conditions REV 04-07.doc
<br /> 00700 - 7
<br /> FAPublic Works%ENGINEERING DIVISION PROJECTS\1102-Old Dixie Hwy Swk 8th St to SR 60-LAPWdmimlbid dodumentsXMaster Contract Documents100700 - General Conditions
<br /> REV
<br /> 04.07.doc
<br />
|