My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-204A
CBCC
>
Official Documents
>
2010's
>
2012
>
2012-204A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2016 10:24:25 AM
Creation date
10/1/2015 4:48:08 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/13/2012
Control Number
2012-204A
Agenda Item Number
8.E.
Entity Name
Timothy Rose Contracting
Subject
Contract Documents Specifications
Federal Aid Project FM #425710-1-28-01
Area
Old Dixie Highway 8th St. to SR 60
Project Number
1102
Supplemental fields
SmeadsoftID
11622
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contract Documents and check and verify pertinent <br /> figures therein and all applicable field measurements. jr�rk and to discuss the schedules o in para- <br /> CONTRACTOR shall promptly report in writing to ph 2 . 05. 13 , proced andling Shop Drawings <br /> nin� <br /> ENGINEER any conflict, error, ambiguity, or oth r als , processing Applications for <br /> irldiscrepancy which CONTRACTOR may discover and , <br /> shall obtain a written interpretation or clarification from <br /> ENGINEER before proceeding with any Work affected 2007 Initial Acceptance of Schedules <br /> thereby; however, CONTRACTOR shall not be liable <br /> to OWNER or ENGINEER for failure to report any A. Unless otherwise provided in the Contract <br /> conflict, error, ambiguity, or discrepancy in the Documents, at least ten days before submission of the <br /> Contract Documents unless CONTRACTOR knew or first Application for Payment a conference attended by <br /> reasonably should have known thereof. CONTRACTOR , ENGINEER, and others as approprk <br /> ate will be held to review for acceptability to ENGI- <br /> B . Preliminary Schedules: Within ten days after NEER as provided below the schedules submitted in <br /> the Effective Date of the Agreement ( unless otherwise accordance with paragraph 2 . 05 . 6: CONTRACTOR <br /> specified in the General . Requirements), CONTRAC- shall have an additional ten days to make corrections <br /> TOR shall submit to ENGINEER for its timely review: and adjustments and to complete and resubmit the <br /> schedules. No progress payment shall be made to <br /> 1 . a preliminary progress schedule CONTRACTOR until acceptable schedules are <br /> indicating the times (numbers of days or dates) submitted to ENGINEER . <br /> for starting and completing the various stages <br /> of the Work, including any Milestones specified 1 . The progress schedule will be <br /> in the Contract Documents; acceptable to ENGINEER if it provides an <br /> orderly progression of the Work to completion <br /> 20 a preliminary schedule of Shop within any specified Milestones and the <br /> Drawing and Sample submittals which will list Contract Times. Such acceptance will not <br /> each required submittal and the times for sub- impose on ENGINEER responsibility for the <br /> mitting , reviewing , and processing such progress schedule, for sequencing , scheduling , <br /> submittal; and or progress of the Work nor interfere with or <br /> relieve CONTRACTOR from . CONTRACTOR's <br /> 3* a preliminary schedule of values for full responsibility therefor, <br /> all of the Work which includes quantities and <br /> prices of items which when added together 2 . CONTRACTOR's schedule of Shop <br /> equal the Contract Price and subdivides the Drawing and Sample submittals will be <br /> Work into component parts in sufficient detail to acceptable to ENGINEER if it provides a <br /> serve as the basis for progress payments workable arrangement for reviewing and <br /> during performance of the Work. Such prices processing the required submittals. <br /> will include an appropriate amount of overhead <br /> and profit applicable to each item of Work. 3. CONTRACTOR's schedule of values <br /> will be acceptable to ENGINEER as to form <br /> and substance if it provides a reasonable <br /> the Site is started , CONTRACTOR and OWNE all allocation of the Contract Price to component <br /> each deliver to the other, with copi o each parts of the Work. <br /> additional insured identified in upplementary <br /> Conditions, certificates of ' urance (and other ARTICLE 3 - CONTRACT DOCUMENTS : INTENT, <br /> evidence of insuranc ich either of them or any AMENDING , REUSE <br /> additional insur ay reasonably request) which <br /> CONTRA and OWNER respectively are <br /> 1 ; to P. I.I .M.hase and maintain iR aGGGrdaAG8 With 3 . 01 Intent <br /> A. The Contract Documents are comple- <br /> 2 . 06 Preconstruction Conference mentary; what is called for by one is as binding as . if <br /> called for by alle <br /> Am Within 20 days aft9F thA CAMURGt1i <br /> to run , but before any Wo ire is started , a B . It is the intent of the Contract Documents <br /> to <br /> conference y CONTRACTOR , ENGINEER , describe a functionally complete Project (or part and�dffers as appropriate will <br /> be held to establish a of) to be constructed in accordance with the Contract <br /> 00700 - General Conditions REV 0"7.doc <br /> 00700 - 9 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\1102.Old Dixie Hwy Swk 8th St to SR 60-LAPMrnim\bid documentsWaster Contract Documents\00700 - General Conditions <br /> REV <br /> 04-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.