My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-024
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 1:07:35 PM
Creation date
10/1/2015 1:35:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/07/2011
Control Number
2011-024
Agenda Item Number
none
Entity Name
Timothy Rose Contracting
Indian River Land Trust
Subject
Lagoon Greenway Phase 1 Construction Agreement
Area
Flinn Tract Florida Inland Navitgation District
Supplemental fields
SmeadsoftID
9231
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
operations subject to the approval of the Engineer. All compaction equipment shall be in good <br /> working order and any worn or defective equipment shall be immediately replaced or repaired . <br /> 8 ) SOIL STABILITY AND COMPACTION CONTROL <br /> A) The Contractor shall arrange to have sufficient soil tests made by an independent testing <br /> laboratory selected by the Engineer to demonstrate conformance of his work with the stability and <br /> compaction levels required by these specifications , Compaction tests shall be taken at intervals <br /> listed herein or as deemed necessary by the Engineer. <br /> B) Any proposed alternative test methods to those specified herein must be proved by the Engineer <br /> prior to testing . At the request of the Engineer, the contractor shall provide such documentation <br /> of a proposed alternative test method as the Engineer may require to evaluate the method for <br /> approval . <br /> C) In no case shall the Contractor proceed with construction on compacted material until the tests <br /> prove satisfactory and approval is given by the Engineer. <br /> D) In general , at least one test for maximum dry density/optimum moisture content shall be <br /> performed on a representative sample of each inherently different material to be used for <br /> compacted backfill or embankment fill . For material of uniform composition and textural class , a <br /> minimum of one test per 200 cu , yd . of material shall be performed at the point of use . Tests for <br /> in - place density ( percent compaction) shall be taken at locations designated by the Engineer. <br /> SW-3-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.