My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-024
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 1:07:35 PM
Creation date
10/1/2015 1:35:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/07/2011
Control Number
2011-024
Agenda Item Number
none
Entity Name
Timothy Rose Contracting
Indian River Land Trust
Subject
Lagoon Greenway Phase 1 Construction Agreement
Area
Flinn Tract Florida Inland Navitgation District
Supplemental fields
SmeadsoftID
9231
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A) The prime coat shall be a rapid curing liquid cut back asphalt equal or equivalent to RC-70 or <br /> RC-250 at the Contractor' s option , and conforming to Sections 300 and 916-2 of the 1986 Edition <br /> of the Florida D . O . T. Standard Specifications for Road and Bridge Construction , <br /> B) The surface of the base material shall be cleaned after final compaction and the moisture content <br /> of the base shall not exceed 90 percent of the optimum moisture before the prime coat is applied . <br /> The prime coat shall be applied uniformly with a pressure distributor. The entire length of the <br /> spray bar shall be set at the height above the surface recommended , by the Manufacturer for <br /> even distribution . The prime coat shall be applied to the finished base course at the rate of 0 . 15 <br /> gallons per square yard at a temperature between 100° F . to 150° F . The prime coat shall be <br /> applied such that a period of no longer than two (2) hours lapse prior to application of the <br /> asphaltic concrete wearing course , unless the prime coat is covered with sand or screenings as <br /> outlined in Section 300-6 . 5 of the 1986 Edition of the Florida D . O . T. Specifications . <br /> 6 ) TESTING <br /> A) The maximum density and optimum moisture shall be determined in accordance with the <br /> Modified Proctor Test procedures of ASTM- D1557 or AASHTO-TI80 ( Method. D) . The <br /> percentage compaction and in-place density shall be determined according to procedures of <br /> ASTM- D2167 "Test for Density of Soil In- Place by the Rubber Balloon . Method " or the nuclear <br /> method HJTM - D2922 . In general , one Modified Proctor Test per 300 lineal feet of roadwork shall <br /> be performed on a representative sample of base material from locations) designated by the <br /> Engineer. In-place density testing shall be performed at the rate of one test per 300 lineal feet of <br /> roadwork at comparable locations unless otherwise specified by the Engineer . <br /> 1 <br /> RP-3-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.