The initial pass with the roller should be made as soon as it is possible to roll the bituminous <br /> mixture without cracking the mat or having the mix adhere to the roller wheels . <br /> E) The rolling shall be done by a " Rolling Train " , consisting of a steel wheel seal roller, and a <br /> pneumatic tired traffic roller and a steel wheel finish roller. All of which shall be on the job when <br /> the asphalt laying commences and remain on the project until the paving work has been <br /> completed . <br /> F) Rolling of the longitudinal joint should be immediately behind the paving operation . The initial <br /> pass with the roller should be made as soon as it is possible to roll the bituminous mixture without <br /> cracking the mat or having the mix adhere to the roller wheels . To prevent adhesion of the mix to <br /> the roller, the wheels should be kept moist with only enough water to avoid picking up the <br /> material . <br /> G) Steel wheeled rollers shall be of the tandem type . For seal rolling, these rollers shall weigh <br /> between 5 and 12 tons and for final rolling , they shall weigh between 8 and 12 tons . <br /> H) Traffic rollers shall be of the self propelled pneumatic tired type , equipped with at least seven (7) <br /> smooth tread , low pressure tires , with the tire pressure maintained between 50 to 55 pounds . <br /> Traffic rollers shall weigh between 6 and 10 tons . Wobble wheeled rollers are prohibited from <br /> I rolling on this project . <br /> 1 ) The speed should not exceed 3 mph for steel wheeled rollers or 5 mph for pneumatic tired rollers . <br /> J ) Finish rolling should be done while the material is still workable enough for removal of roller <br /> marks , before the pavement temperature has dropped below 140 ° F . Abrupt turning of rollers on <br /> the paving mix which causes undue displacement shall not be permitted . Finish rolling should be <br /> accomplished by use of the steel wheel roller. <br /> K) Should any irregularities or defects remain in any course after compaction , they should be <br /> removed promptly and replaced with new material to provide a uniform texture surface <br /> conforming to line and grade . The finished surface shall be such that it will not vary more than <br /> one forth inch ( 1 /4") from the ten foot ( 10') straight edge applied both parallel and perpendicular <br /> to the center line of the pavement . The thickness of the pavement shall be no more than one <br /> forth inch ( 1 /4") greater or less than the specified thickness . Correction of deficiencies in <br /> pavement thickness will be in strict accordance with those procedures described in Section 330 <br /> 14 . 2 of the Florida D . O . T . Specifications for Road and Bridge Construction , 1986 Edition . <br /> L) Areas which are inaccessible to a roller (such as adjacent to curbs , gutters ,, manholes , etc) shall <br /> be compacted by the use of hand tamps , small vibratory tampers , or other satisfactory means . <br /> M ) The edges of the wearing surface shall be straight , true , and clean in all cases , and must meet <br /> the approval of the Engineer. Should the edges of the wearing surface not meet the approval of <br /> i the Engineer, they shall be saw cut to a straight, true , clean line by the Contractor at his expense . <br /> i <br /> I <br /> I <br /> i <br /> i <br /> i <br /> i <br /> RP-4 -2 <br /> l <br /> i <br />