My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-024
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 1:07:35 PM
Creation date
10/1/2015 1:35:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
02/07/2011
Control Number
2011-024
Agenda Item Number
none
Entity Name
Timothy Rose Contracting
Indian River Land Trust
Subject
Lagoon Greenway Phase 1 Construction Agreement
Area
Flinn Tract Florida Inland Navitgation District
Supplemental fields
SmeadsoftID
9231
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3) Prior to installation , the interior of all pipe and fittings shall be inspected for debris , sediment <br /> accumulation , sand , and the like , and shall be cleaned as required to remove such foreign <br /> matter. Joint surfaces such as gaskets , gasket grooves , spigots, and bells shall be cleaned of <br /> sand and grit prior to joining . <br /> 4) Gasket lubricants shall be stored and applied in a manner that will prevent significant <br /> contamination or pick-up of sand and grit . <br /> 5) The pipe spigot shall be centered in and aligned with its mating bell prior to insertion and <br /> forced evenly in a straight line to seating depth , taking care not to over- bell the joint . Where <br /> required , deflections shall be made after the joint is seated . <br /> 6) Joining shall generally be done by hand or by hush- bar with a cushion block whenever pipe <br /> size and weight permit. When a mechanical pushing/pulling device such as chain -puller, <br /> come-along , and the like is required , the device shall be used in a manner that will not deform <br /> gouge , chip , or otherwise damage the pipe or cause significant disturbance of the prepared <br /> bedding . In no case shall joints be made by "popping-on" or swinging the spigot into the bell <br /> to seat the joint . <br /> 7 ) Fittings and appurtenances shall be fully, independently supported on the bedding or on a <br /> permanent foundation so as not to bear on the pipe upon completion of the installation . <br /> 8 ) The installed piping system shall be kept free of dirt, trench water, and other foreign matter <br /> during the progress of the work, and all open ends of the line shall be sealed with watertight <br /> plugs whenever work is not in progress . <br /> 9) Empty installed pipe shall be secured against flotation due to potential trench flooding by <br /> timely placement of sufficient backfill or approved anchoring devices sufficient to resist pipe <br /> buoyancy . <br /> 10 ) INSTALLATION OF FITTINGS <br /> A) Fittings , plugs , and caps shall be set and jointed to pipe in the manner heretofore specified for <br /> cleaning , laying and jointing pipe . <br /> 11 ) INSTALLATION OF DRAINAGE STRUCTURES <br /> A) Excavation for drainage structures shall be of sufficient size to permit construction of the structure <br /> to progress without hindrance from the walls of the excavation or from sloughed materials . No <br /> less than 12 inches clearance shall be provided between excavation walls and walls of the <br /> structure . If soil conditions encountered at the bottom of the excavation would in the sole opinion <br /> of the Engineer be unsuitable for foundation , the Contractor shall remove and dispose of the <br /> unsuitable material to the depth where suitable bearing can be obtained . The determination of <br /> the necessity for and the extent of additional excavation shall be made by the Engineer, who shall <br /> inform the Contractor in writing regarding such necessity and the extent. This excavation shall <br /> then be backfilled to the appropriate grade with Type 1 or Type 3 backfill material , placed in 8 <br /> inch layers and compacted to a density equal to 100 percent of the maximum density as <br /> determined by AASHTO T180 , <br /> B) Installation of drainage structures shall conform to the details as shown on the Drawings and , <br /> unless otherwise specified , shall conform with Section 425 of the 1986 Edition of the Florida <br /> D . O . T . Standard Specifications for Road and Bridge Construction . Backfill shall be placed in lifts <br /> not to exceed 12 inches loose depth and compacted to 95 percent of maximum density per <br /> AASHTO T- 180 in unpaved areas and to required subgrade density in areas of paving or curbing . <br /> C ) Backfill shall not be placed against cast-in-place concrete structures until the concrete has <br /> attained sufficient strength to resist the load without damage , and in no case , less than seven <br /> days after the concrete was placed . <br /> D -3-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.