Laserfiche WebLink
�i <br /> N "LINM giAA N '. W"4f,:`�' ' ' y �zpfg1L E?' ?v S?.f�.c-� c v ' ',� wk-ee ntlL <br /> _ 1 .t , - <br /> establish the standards by which such portion of the 47 . Unit Price Work--Work to be paid <br /> for on <br /> Work will be judged . the basis of unit prices . <br /> 39 . Shop Drawings--All drawings , diagrams , 48 . Work--The entire completed construction <br /> illustrations , schedules , and other data or information or the various separately identifiable parts thereof <br /> re- <br /> which are specifically prepared or assembled by or for quired to be provided under the Contract Documents . <br /> CONTRACTOR and submitted by CONTRACTOR to Work includes and is the result of performing or <br /> illustrate some portion of the Work . providing all labor, services , and documentation <br /> necessary to produce such construction , and <br /> 40 . Site--Lands or areas indicated in the furnishing , installing , and incorporating all materials <br /> Contract Documents as being furnished by OWNER and equipment into such construction , all as required <br /> upon which the Work is to be performed , including by the Contract Documents , <br /> rights-of-way and easements for access thereto , and <br /> such other lands furnished by OWNER which are 49 . Work Change Directive--A written <br /> designated for the use of CONTRACTOR. statement to CONTRACTOR issued on or after the <br /> Effective Date of the Agreement and signed by <br /> 41 . Specifications--That part of the Contract OWNER and recommended by ENGINEER ordering <br /> Documents consisting of written technical descriptions an addition , deletion , or revision in the Work , or <br /> of materials , equipment, systems , standards , and responding to differing or unforeseen subsurface or <br /> workmanship as applied to the Work and certain physical conditions under which the Work is to be <br /> administrative details applicable thereto . performed or to emergencies . A Work Change <br /> Directive will not change the Contract Price or the <br /> 42 . Subcontractor--An individual or entity Contract Times but is evidence that the parties expect <br /> having a direct contract with CONTRACTOR or with that the change ordered or documented by a <br /> Work <br /> any other Subcontractor for the performance of a part Change Directive will be incorporated in a subse- <br /> of the Work at the Site , quently issued Change Order following negotiations by <br /> the parties as to its effect, if any, on the Contract Price <br /> 43 . Substantial Completion--The time at or Contract Times , <br /> which the Work (or a specified part thereof) has <br /> progressed to the point where , in the opinion of 50 . Written Amendment--A written statement <br /> ENGINEER, the Work (or a specified part thereof) is modifying the Contract Documents , signed by <br /> sufficiently complete , in accordance with the Contract OWNER and CONTRACTOR on or after the Effective <br /> Documents , so that the Work (or a specified part Date of the Agreement and normally dealing with the <br /> thereof) can be utilized for the purposes for which it is nonengineenng or nontechnical rather than strictly <br /> intended . The terms "substantially complete" and construction-related aspects of the Contract Docu - <br /> "substantially completed" as applied to all or part of the ments . <br /> Work refer to Substantial Completion thereof. <br /> 1 . 02 Terminology <br /> 44 . Supplementary Conditions--That part of <br /> the Contract Documents which amends or A. Intent of Certain Terms or Adjectives <br /> IN <br /> supplements these General Conditions , <br /> 1 . Whenever in the Contract Documents the <br /> 45 . Supplier--A manufacturer, fabricator, terms "as allowed , " "as approved , " or terms of like <br /> supplier, distributor, materialman , or vendor having a effect or import are used , or the adjectives <br /> IN <br /> direct contract with CONTRACTOR or with any "reasonable , " "suitable , " "acceptable , " "proper, " <br /> Subcontractor to furnish materials or equipment to be "satisfactory, " or adjectives of like effect or import <br /> incorporated in the Work by CONTRACTOR or any are used to describe an action or determination <br /> of <br /> Subcontractor. ENGINEER as to the Work , it is intended that such <br /> action or determination will be solely to evaluate , in <br /> 46 . Underground Facilities--All underground general , the completed Work for compliance with <br /> pipelines , conduits , ducts , cables , wires , manholes , the requirements of and information in the Contract <br /> vaults , tanks , tunnels , or other such facilities or Documents and conformance with the design <br /> attachments , and any encasements containing such concept of the completed Project as a functioning <br /> IN <br /> facilities , including those that convey electricity, gases , whole as shown or indicated in the Contract <br /> steam , liquid petroleum products , telephone or other Documents (unless there is a specific statement <br /> communications , cable television , water, wastewater, indicating otherwise) . The use of any such term or <br /> storm water, other liquids or chemicals , or traffic or adjective shall not be effective to assign <br /> to ENGk <br /> other control systems . NEER any duty or authority to supervise or direct <br /> the performance of the Work or any duty or <br /> 00700 - General Conditions REV 04-07 .doc <br /> 0 - 7 <br /> 0 -07 .doc 4lic Works\ENGINEERING DIVISION PROJECTS\0923A Trans Florida Greenway (oAtt Sebastian River Middle School )\Admim\Contract Documents\00700 - <br /> General Conditions REV <br /> 4-07 . <br /> 11 It IN <br /> IN IN I ' LL I <br /> IN IN <br /> N ILL' <br /> - 11 NNN <br /> IN IxI ' LL ILI <br /> z <br />