My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-227B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-227B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 10:31:08 AM
Creation date
10/1/2015 3:08:21 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/08/2011
Control Number
2011-227B
Agenda Item Number
8.B.
Entity Name
Timothy Rose Contracting
Subject
Trans-Florida Greenway Trail North County Park to Sebastian Crossings
Trans-Florida Railroad Corridor
Area
Trans-Florida Greenway Trail
Project Number
0923A
Bid Number
2012011
Archived Roll/Disk#
112-0008-R
Supplemental fields
SmeadsoftID
10416
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If <br /> ✓ 4 . _ , wtx .' > qty s ,_ ? : r , <br /> 444 <br /> Contract Documents unless CONTRACTOR knew or ate will be held to review for acceptability to <br />ENGI - <br /> reasonably should have known thereof. NEER as provided below the schedules submitted in <br /> accordance with paragraph 2 . 05 . 6 . CONTRACTOR <br /> B . Preliminary Schedules: Within ten days after shall have an additional ten days to make corrections <br /> the Effective Date of the Agreement ( unless otherwise and adjustments and to complete and resubmit the <br /> specified in the General Requirements ) , CONTRAC- schedules . No progress payment shall be made to <br /> ' TOR shall submit to ENGINEER for its timely review: CONTRACTOR until acceptable schedules are <br /> submitted to ENGINEER . <br /> 1 . a preliminary progress schedule <br /> indicating the times ( numbers of days or dates ) 1 . The progress schedule will be <br /> for starting and completing the various stages acceptable to ENGINEER if it provides an <br /> of the Work , including any Milestones specified orderly progression of the Work to completion <br /> in the Contract Documents ; within any specified Milestones and the <br /> Contract Times . Such acceptance will not <br /> 2 , a preliminary schedule of Shop impose on ENGINEER responsibility for the <br /> Drawing and Sample submittals which will list progress schedule , for sequencing , scheduling , <br /> each required submittal and the times for sub- or progress of the Work nor interfere <br />with or <br /> mitting , reviewing , and processing such relieve CONTRACTOR from CONTRACTOR's <br /> submittal ; and full responsibility therefor. <br /> 30 a preliminary schedule of values for 2 - CONTRACTOR's schedule of Shop <br /> all of the Work which includes quantities and Drawing and Sample submittals will be <br /> prices of items which when added together acceptable to ENGINEER if it provides a <br /> equal the Contract Price and subdivides the workable arrangement for reviewing and <br /> Work into component parts in sufficient detail to processing the required submittals , <br /> serve as the basis for progress payments <br /> during performance of the Work . Such prices 3 . CONTRACTOR's schedule of values <br /> will include an appropriate amount of overhead will be acceptable to ENGINEER as to form <br /> and profit applicable to each item of Work , and substance if it provides a reasonable <br /> allocation of the Contract Price to component <br /> parts of the Work , <br /> theSite is started , CONTRACTOR and OWN all <br /> each deliver to the other, with copi o each ARTICLE 3 - CONTRACT DOCUMENTS : INTENT , <br /> additional insured identified in t upplementary AMENDING , REUSE <br /> Conditions , certificates of urance (and other <br /> evidence of insurance ich either of them or any <br /> additional insur may reasonably request) which 3 . 01 Intent <br /> CONTRA and OWNER respectively are <br /> A. The Contract Documents are comple- <br /> mentary; what is called for by one is as binding as if <br /> 2 . 06 Preconstruction Conference called for by all . <br /> B . It is the intent of the Contract Documents to <br /> A. %Allithin 2. 0 days after the Goptrant Tm � <br /> describe a functionally complete Project (or part there- <br /> to run , but before any Work at the Site i arted , a of) to be constructed in accordance with <br /> the Contract <br /> conference attended by CONTRACT ENGINEER , Documents . Any labor, documentation , services , <br /> and others as appropriate wil held to establish a materials , or equipment that may reasonably be <br /> inferred from the Contract Documents or from <br /> Work and to disc a schedules referred to in para- prevailing custom or trade usage as being required to <br /> graph 2 . 05 rocedures for handling Shop Drawings produce the intended result will be provided whether <br /> and er submittals , processing Applications for or not specifically called for at no additional cost to <br /> vtjr� OWNER , <br /> 2 , 07 Initial Acceptance of Schedules C . Clarifications and interpretations of the <br /> Contract Documents shall be issued by ENGINEER <br /> A. Unless otherwise provided in the Contract as provided in Article 9 . <br /> Documents , at least ten days before submission of the <br /> first Application for Payment a conference attended by <br /> CONTRACTOR , ENGINEER, and others as appropri - <br /> 00700 - 9 00700 - General Conditions REV 04-07 . doc <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0923A Trans Florida Greenway (At Sebastian River Middle School )\Admim\Contract Documents\00700 - General <br />Conditions REV <br /> 04-07 .doc <br /> iIf- <br /> f In <br />
The URL can be used to link to this page
Your browser does not support the video tag.