Laserfiche WebLink
Mill <br /> ARTICLE 13 - TESTS AND INSPECTIONS ; furnish ENGINEER the required certificates of inspel <br /> CORRECTION , REMOVAL OR ACCEPTANCE OF tion or approval . <br /> DEFECTIVE WORK <br /> D . CONTRACTOR shall be responsible for <br /> arranging and obtaining and shall pay all costs in <br /> 13 . 01 Notice of Defects connection with any inspections , tests , or approvals <br /> required for OWNER's and ENGINEER's acceptance <br /> A. Prompt notice of all defective Work of which of materials or equipment to be incorporated <br /> in the <br /> OWNER or ENGINEER has actual knowledge will be Work ; or acceptance of materials , mix designs , or <br /> given to CONTRACTOR . All defective Work may be equipment submitted for approval prior to <br /> rejected , corrected , or accepted as provided in this CONTRACTOR's purchase thereof for incorporation <br /> Article 13 , in the Work . Such inspections , tests , or approvals <br /> shall be performed by organizations acceptable to <br /> 13 . 02 Access to Work OWNER and ENGINEER . <br /> A . OWNER, ENGINEER, ENGINEER's Con- E . If any Work (or the work of others ) that is to <br /> sultants , other representatives and personnel of be inspected , tested , or approved is covered by CON - <br /> OWNER , independent testing laboratories , and TRACTOR without written concurrence of ENGI - <br /> governmental agencies with jurisdictional interests will NEER, it must , if requested by ENGINEER, be uncov- <br /> have access to the Site and the Work at reasonable ered for observation , <br /> times for their observation , inspecting , and testing . <br /> CONTRACTOR shall provide them proper and safe F . Uncovering Work as provided in paragraph <br /> conditions for such access and advise them of 13 . 03 . E shall be at CONTRACTOR's expense unless <br /> CONTRACTOR's Site safety procedures and CONTRACTOR has given ENGINEER timely notice <br /> programs so that they may comply therewith as of CONTRACTOR's intention to cover the same and <br /> applicable . ENGINEER has not acted with reasonable prompt- <br /> 13 . 03 Tests and Inspections ness in response to such notice . <br /> A. CONTRACTOR shall give ENGINEER timely 13 . 04 Uncovering Work <br /> notice of readiness of the Work for all required A. If any Work is covered contrary to the written <br /> inspections , tests , or approvals and shall cooperate request of ENGINEER, it must, if requested by ENGk <br /> with inspection and testing personnel to facilitate NEER , be uncovered for ENGINEER's observation <br /> required inspections or tests . and replaced at CONTRACTOR's expense . <br /> B . OWNER shall empley and pay for the B . If ENGINEER considers it necessary or <br /> advisable that covered Work be observed by ENGk <br /> NEER or inspected or tested by others , CONTRAC- <br /> TOR, at ENGINEER's request, shall uncover, expose , <br /> or otherwise make available for observation , inspec- <br /> tion , or testing as ENGINEER may require , that <br /> portion of the Work in question , furnishing all neces- <br /> bele'^ ; sary labor, material , and equipment . If it is found that <br /> such Work is defective , CONTRACTOR shall pay all <br /> 20 that Gl OnGlUrred OR GGRIP1913til With Claims , costs , losses , and damages ( including but not <br /> limited to all fees and charges of engineers , architects , <br /> pairagraph 13 04 . 13 shall be paid as provided OR attorneys , and other professionals and all court or <br /> arbitration or other dispute resolution costs ) arising out <br /> of or relating to such uncovering , exposure , observa- <br /> tion , inspection , and testing , and of satisfactory <br /> replacement or reconstruction ( including but not <br /> limited to all costs of repair or replacement of work of <br /> C . If Laws or Regulations of any public body others ) ; and OWNER shall be entitled to an <br /> having jurisdiction require any Work (or part thereof) appropriate decrease in the Contract Price . <br /> If the <br /> specifically to be inspected , tested , or approved by an parties are unable to agree as to the amount <br /> thereof, <br /> employee or other representative of such public body, OWNER may make a Claim therefor as provided in <br /> CONTRACTOR shall assume full responsibility for paragraph 10 . 05 . If, however, such Work is not found <br /> arranging and obtaining such inspections , tests , or to be defective , CONTRACTOR shall be allowed an <br /> approvals , pay all costs in connection therewith , and increase in the Contract Price or an extension <br /> of the <br /> 00700 - 35 00700 - General Conditions REV 04-07 . doc <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\0923A Trans Florida Greenway (At Sebastian River Middle School )VAdmim\Contract Documents\00700 - General <br /> Conditions REV <br /> 04-07 .doc <br /> wrillill <br /> All I- <br /> _ _ <br />