My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-227B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-227B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 10:31:08 AM
Creation date
10/1/2015 3:08:21 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/08/2011
Control Number
2011-227B
Agenda Item Number
8.B.
Entity Name
Timothy Rose Contracting
Subject
Trans-Florida Greenway Trail North County Park to Sebastian Crossings
Trans-Florida Railroad Corridor
Area
Trans-Florida Greenway Trail
Project Number
0923A
Bid Number
2012011
Archived Roll/Disk#
112-0008-R
Supplemental fields
SmeadsoftID
10416
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ti <br /> a <br /> _ <br /> IL <br /> 1 . inspections , tests , or approvals covered by paragraphs 13 . 03 . 0 and 13 . 03 . D <br /> below; <br /> 20 costs incurred in connection with tests or inspections pection conducted <br /> pursuant nt to <br /> paragraph 13 . 04 . 13 shall be paid as provided in said paragraph 13 . 04 . 13 ; <br /> 30 tests otherwise specifically provided in the Contract Documents . <br /> 13 . 05 OWNER May Stop the Work <br /> SC- 13 . 05 . A . Delete paragraph GC43. 05. A in its entirety and insert the following paragraph in its <br /> place: <br /> A . If the Work is defective , or CONTRACTOR fails to supply sufficient skilled workers <br /> or suitable materials or equipment , or fails to comply with permit requirements , or <br /> fails to comply with the technical specifications , or fails to perform the Work in such <br /> a way that the completed Work will conform to the Contract Documents , OWNER <br /> may order CONTRACTOR to stop the Work , or any portion thereof, until the cause <br /> for such order has been eliminated ; however, this right of OWNER to stop the Work <br /> shall not give rise to any duty on the part of OWNER to exercise this right for the <br /> benefit of CONTRACTOR , any Subcontractor, any Supplier, any other individual or <br /> entity, or any surety for, or employee or agent of any of them . <br /> 14 . 02 Progress Payments <br /> SC- 14 . 02 . 13 . 5 . Delete paragraph GC- 14. 02. B. 5. d in its entirety and insert the following paragraph <br /> in its place: <br /> d . ENGINEER has actual knowledge of the occurrence of any of the events <br /> enumerated in paragraph 15 . 02 . A ; or { <br /> SC- 14 . 02 . 13 . 5 . Add the following sentences at the end of paragraph GC- 14. 02. B. 5: <br /> e . OWNER has been required to pay ENGINEER additional compensation because <br /> Of CONTRACTOR delays or rejection of defective Work ; or <br /> f. OWNER has been required to pay an independent testing laboratory for <br /> subsequent inspections , tests , or approvals taken after initial failing <br /> inspections , tests , or approvals . <br /> SC- 14 . 02 . C . 1 . Delete paragraph GC44. 02. C. 1 in its entirety and insert the following <br /> paragraph in its place : <br /> C . Payment Becomes Due <br /> 1 . Payment shall be made by OWNER to CONTRACTOR according to the Local <br /> Government Prompt Payment Act . F . S . 218 . 70 et. seq . <br /> SC- 14 . 04A . After the third sentence in paragraph GC- 14. 04A of the General Conditions, <br /> delete the remainder of paragraph 14. 04A in its entirety and replace with the following: <br /> " If Engineer considers the Work substantially complete , Engineer will prepare and <br /> deliver to Owner a tentative certificate of Substantial Completion that shall fix the <br /> 00800-7 <br /> 00800 - supplementary Conditions 06-09 rev. doc <br /> 00800 7F:\Public Works\ENGINEERING DIVISION PROJECTS\0923A Trans Florida Greenway (At Sebastian River Middle School )Wdmim\Contract Documents\00800 - <br /> Supplementary Conditions 06-09 rev.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.