My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-227B
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-227B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2016 10:31:08 AM
Creation date
10/1/2015 3:08:21 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/08/2011
Control Number
2011-227B
Agenda Item Number
8.B.
Entity Name
Timothy Rose Contracting
Subject
Trans-Florida Greenway Trail North County Park to Sebastian Crossings
Trans-Florida Railroad Corridor
Area
Trans-Florida Greenway Trail
Project Number
0923A
Bid Number
2012011
Archived Roll/Disk#
112-0008-R
Supplemental fields
SmeadsoftID
10416
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
397
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
» ' <br /> 14 1 'In I# ``A` ,,*s+,an *. „r , ,,•`r~: tee,' #' n °' ,� s <br /> a , d r, "a _ <br /> s - '„ ` :,, .>� <br /> 01340 — Submittal of Shop Drawings <br /> 1 . 5 CONTRACTOR 'S RESPONSIBILITIES FOR SUBMITTAL OF SHOP <br /> DRAWINGS PRODUCT DATA AND SAMPLES <br /> A . The CONTRACTOR ' s responsibilities for submittal of shop drawings , <br /> Product data , and samples are set forth in paragraph 6 . 17 of the General <br /> Conditions and as further explained herein . <br /> B . Prior to submission , thoroughly check shop drawings , product data , and <br /> samples for completeness and for compliance with the Contract <br /> Documents , verify all dimensions and field conditions , and coordinate the <br /> shop drawings with the requirements for other related work . Also review <br /> each shop drawing before submitting it to the ENGINEER to determine <br /> that it is acceptable in terms of the means , methods , techniques , <br /> sequences and operations of construction , safety precautions and <br /> programs incidental thereto , all of which are the CONTRACTOR ' s <br /> responsibility . <br /> 1 . It is CONTRACTOR 'S responsibility to review submittals made by <br /> his suppliers and Subcontractors before transmitting them to <br /> ENGINEER to assure proper coordination of the Work and to <br /> determine that each submittal is in accordance with its desires and <br /> that there is sufficient information about materials and equipment <br /> for ENGINEER to determine compliance with the Contract <br /> Documents . <br /> 2 . Incomplete or inadequate submittals will be returned for revision <br /> without review . <br /> C . The CONTRACTOR's responsibility for errors and omissions in submittals <br /> is not relieved by the ENGINEER's review of submittals . The <br /> CONTRACTOR shall approve the shop drawings based on his in -the -field <br /> measurements , prior to submittal to the ENGINEER for his review . <br /> D . Notify the ENGINEER , in writing at the time of submission , of deviations in <br /> submittals from the requirements of the Contract Documents . The <br /> CONTRACTOR's responsibility for deviations in submittals from the <br /> requirements of the Contract Documents is not relieved by the <br /> ENGINEER 's review of submittals , unless the ENGINEER gives written <br /> acceptance of specific deviations . <br /> E . Begin no work , which requires submittals until return of submittals with the <br /> ENGINEER 's stamp and initials or signature indicating the submittal has <br /> been reviewed . <br /> 01340-2 01340 - Submittal of Shop Drawings . doc <br /> F:\Public Works\ENGINEERING DIVISION PROJECT3\0923A Trans Florida Greenway (At Sebastian River Middle School )\Admim\Contract <br /> Documents\01340 - Submittal of Shop Drawings. doc <br /> 77,77,x77777 Y <br /> In J77"7 OeI <br /> WI, ` In <br /> +k r fi ' <br /> 3 <br /> In I <br /> nk Tr <br /> .;u. . „ ... � - .. . . . i � ._ . . . <br />i _ . .i . . . _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.