My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-145
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-145
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2016 11:53:44 AM
Creation date
10/1/2015 2:42:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/05/2011
Control Number
2011-145
Agenda Item Number
8.J.2
Entity Name
Florida Power and Light
Subject
Installation of underground distribution facilities
SRA Transit Facilities
Area
Elections Building
Alternate Name
FPL
Supplemental fields
SmeadsoftID
10010
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WR # 3981578 <br /> FPL <br /> Date <br /> Florida Power & Light Company <br /> 3301 ORANGE AVE <br /> FT PIERCE , FL 34947 <br /> Re : Installation of Underground Electric Distribution Facilities <br /> Project: SRA TRANSIT FACILITIES <br /> Florida Power & Light Company Work Request # 3981578 <br /> Dear DENNIS G . PAGANO : <br /> This is to notify you that the site at the aforementioned project is ready for the installation of your underground electric <br /> distribution facilities : <br /> 1 . The underground cable route has been cleared of trees , stumps and other obstructions . <br /> 2 . The cable route has been filled or cut to within 6" of final grade . <br /> 3 . Grade stakes have been set along the cable route marked to indicate final grade . <br /> 4 . Lot lines and corners have been staked as you requested for reference to locate the cable route . <br /> 5 . Any grade or reference stakes found missing will be replaced by our surveyors at your request. <br /> 6 . All flooded areas have been drained . <br /> 7 . All underground facilities have been staked within 2 feet of their location along the cable route . Stakes are <br /> marked with depth , size and type of facility . <br /> 8 . The above conditions will be maintained throughout construction of FPL facilities . <br /> Signed for Owner/ Developer <br />
The URL can be used to link to this page
Your browser does not support the video tag.