My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-124
CBCC
>
Official Documents
>
2010's
>
2010
>
2010-124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2016 11:58:24 AM
Creation date
10/1/2015 2:14:09 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Department of Utilities <br /> COST ESTIMATE and CONTRACTOR'S BID ITEM LIST <br /> Project <br /> Description : 16th Street at 66th Avenue Directional Bores to East and Southeast sides of 66th Avenue from Northwest Corner <br /> Date : 5/3/2010, UCP 4053 <br /> TwpDirectional Bores - 6" HDPE DRI l LABOR COST MATERIAL COSTS <br /> Bid Bid Item Estimated Unit of Labor Unit Total Labor Material Unit Total Material <br /> Item No. Description Quanti Measure Price Price Price Price <br /> 71 Mobilization. Demobilization. MOT 1 .0 10. 00% $ 1 , 725 .00 <br /> 011' Install 6" PVC Force Main 60.0 LF $6.00 $360 .00 $4.05 $243 .00 <br /> 05b Install 6" HOPE Horizontal Directional Drill 460 . 0 LF $ 19 . 00 $8, 740.00 $5 .34 S2456.40 <br /> 07 Install Mechanical Restrained Joint DI Fittings 1 .5 TON $3 ,500 .00 $5 ,250.00 $3 , 500.00 $53250.00 <br /> 18c Install 6" NRS Gate Valve & Box 4 .0 EA. $ 150 .00 $600 .00 $420 .00 $ 15680.00 <br /> 22 Test Holes / Potholes 4 .0 EA. $200 .00 $800.00 <br /> 67a Lawn Restoration (Topsoil and Sod) 21000.0 SF $0.25 $500.00 $0 .25 $ 500. 00 <br /> Record Drawings per IRCDUS Standards, See <br /> Section 01025 for Price to be used for Each Work I LS $ 1 ,000.00 $ 19000.00 <br /> 70 Authorization <br /> Subtotal Subtotal Sewer Svstem Labor $ 17,250. 00 Subtotal Materials $ 10, 129 .40 <br /> Subtotal Subtotal Sewer System Labor. Mob.. Demob.. $ 18,975 . 00 <br /> MOT. Materials. & Permitting <br /> $ 10, 129 .40 <br /> Force Accra. IRCDUS Contingency Account 1 EA 10% $ 1 ,897 . 50 $ 1 ,012 .94 <br /> SubTotal Labor Cost 520,872.50 Subtotal Material Costs $ 11 , 142.34 <br /> TOTAL PROJECT COST $32,014.84 <br /> Attachment 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.