Laserfiche WebLink
QUESTION NO . 40 <br /> Are there any xequiremcrrts for fencing and or landscaping around th ;° new <br /> transformer location? <br /> ANSWER : <br /> 'there are no requirements for fencing and or landscaping around the new transformer <br /> location. <br /> QUESTION 110. 5 ; <br /> Are there any clearance requirements of the .high voltage transmission line located <br /> behind the outfield of Field No . I ? <br /> .ANSWER , <br /> .rhe clearance requirement for the high. voltage transmission lines lnust be <br /> coordinated with the City of Vero Beach Electric Utilities . Please contact Chris <br /> Blahnik { 772 - 978 - 5467} for coordination on power line clearance . Pl. r;< see <br /> attached revised Special :Purpose Survey for Vero Beach Sports Village (4 Sheets), <br /> showing the location of the transmission lines and canal top of bank . <br /> QUESTION 110. 6 <br /> Being that any fighting system will have to instal) poles on the edge o I ' the existing <br /> canals , are there going to be any SPA permits required, and if so, will the city be <br /> taking care of any such requirements ? <br /> ANSWER , <br /> Obtaining all required permits and associated fees are th`e responsibilitty of the <br /> contractor . EPA permit .is not anticipated, however, it is the contractor ' s <br /> responsibility to verify if permit is required. <br /> Page .3 of 8 <br /> t•; IA011eil'orhslENGINF. F.RINGnIJISION. PROJECTS11042I"$ SPOVIS illn�ellghlingUtdmfmlbidd¢eumFnxclAddendumPlr9iaDE1Vb/IA4NO3 01-17- <br /> 11, doe <br />