Laserfiche WebLink
2 . Additional materials required to achieve alternate foundation . <br /> 3 . Excavation and removal of materials other than normal soils , such as rock , caliche , etc . <br /> E . Foundation Drawings : Project specific foundation drawings stamped by a registered engineer in the <br /> state where the project is located are required . The foundation drawings must list the moment, shear <br /> ( horizontal ) force , and axial (vertical ) force at ground level for each pole . These drawings must be <br /> submitted at time of bid to allow for accurate pricing . <br /> PART 3 — QUALITY CONTROL <br /> 3 . 1 MATERIALS <br /> A . Approved Materials : All materials supplied by the contractor under the provisions of these <br /> specifications and plans shall be new materials of the kind and character called for by the <br /> specifications . Defective equipment or material damaged in the course of installation or tests shall be <br /> replaced or repaired in a manner satisfactory to the owner. All materials and equipment to be <br /> furnished under these specifications shall be the standard product of a manufacturer regularly <br /> engaged in the production of such material and shall be the manufacturer' s current standard design . <br /> B . Alternate Materials : The materials specified have been determined to have characteristics appropriate <br /> for the purposes of this project. No bid will be approved which proposes to use a non -approved <br /> substitute . Substitutions will not be considered in determining the lowest responsive bid . The owner / <br /> engineer reserves the right to reject any or all bids . <br /> 3 . 2 FIELD QUALITY CONTROL <br /> A. Illumination Measurements : Upon substantial completion of the project and in the presence of the <br /> Contractor, Project Engineer, Owner' s Representative , and Manufacturer' s Representative , illumination <br /> measurements shall be taken and verified . The illumination measurements shall be conducted in <br /> accordance with IESNA RP -6-01 , Appendix B . <br /> B . Correcting Non -Conformance : If, in the opinion of the Owner or his appointed Representative , the <br /> actual performance levels including footcandles , uniformity ratios , and maximum kilowatt <br /> consumptions are not in conformance with the requirements of the performance specifications and <br /> submitted information , the Contractor shall be liable to any or all of the following : <br /> 1 . Contractor shall at his expense provide and install any necessary additional fixtures to meet the <br /> minimum lighting standards. The Contractor shall also either replace the existing poles to meet the <br /> new wind load (EPA) requirements or verify by certification by a licensed structural engineer that <br /> the existing poles will withstand the additional wind load. <br /> 2. Contractor shall minimize the Owner's additional long term fixture maintenance and energy <br /> consumption costs created by the additional fixtures by reimbursing the Owner the amount of <br /> $ 1 , 500. 00 (fifteen hundred dollars) for each additional fixture required. <br /> 3. Contractor shall remove the entire unacceptable lighting system and install a new lighting system <br /> to meet the specifications. <br /> 4 . Due to MiLB ' s yearly audits , contractor shall be responsible for meeting all light levels and <br /> uniformities . If specifications are not achieved , manufacturer will be responsible for all said cost : <br /> parts , labor, cranes , or any other materials . <br /> 42 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\ 1042 VB Sports Village Lighting\Admim\bid documents\Bid Docs VBSV Lighting revised <br /> 12- 13 - IO.doc <br />