PART 4 - EXECUTION <br /> 4 . 1 INSTALLATION <br /> The entire system is to be installed in accordance with the manufacturer' s written instructions . <br /> 4 . 2 Electrical <br /> A. System Design <br /> 1 . The electrical system equipment shall consist of: <br /> a . Conductors and conduit from the main service transformer to the service <br /> entrance panel board . <br /> b . The service entrance panel board with appropriate individual circuit over- <br /> current protection . The panel board shall meet local and National Electrical <br /> Code ( NEC ) requirements for the size of the service , AIC rating , and the type <br /> of the environment to which it will be exposed . Electrical switchgear housing <br /> will be mounted either on a galvanized angle iron , a minimum of W thick , with <br /> hardware that is either stainless steel or hot dipped galvanized . All feeder <br /> breakers shall be bolt on type . <br /> C . Conductors and conduit for the feeder and control circuits from the service <br /> entrance panel board to the lighting control contactors . Lighting control <br /> contactors , supplied by the sports lighting manufacturer, shall be sized per <br /> local codes and the NEC according to the circuit amperage . The contactors <br /> shall be rated for lighting applications and shall be housed in a NEMA 4 <br /> enclosure . <br /> d . Conductors and conduit for the feeder circuit from the service entrance panel <br /> board ( or from the contactor panel if applicable ) to the safety disconnect <br /> mounted in the electrical enclosure on each lighting pole 10 ' above grade . <br /> e . Grounding conductors and grounding methods for the following : <br /> 1 . The main service entrance panel board . ( per NEC or local codes ) <br /> 2 . The lighting contactor enclosure . ( per NEC or local codes) <br /> 3 . Each electrical component enclosure mounted on the lighting poles . <br /> ( Equipment Grounding System ) ( per NEC or local codes ) <br /> 4 . Lightning Protection for individual poles as follows ( per NFPA 780 ) : <br /> a . A 5/8 " x 8 ' copper grounding rod buried vertically in undisturbed earth . <br /> The bottom tip of the grounding rod should reach a minimum of 10 ' <br /> above grade . <br /> b . A copper grounding conductor shall be connected to the top of the <br /> copper grounding rod and extend and connect to the grounding lug <br /> located inside the handhole of the pole approximately 10 ' above <br /> grade . The size of this conductor shall be #2 if the pole is less than <br /> 75 ' in height and #2/0 if the pole is 75 ' in height or greater . <br /> 2 . Underground wiring shall be all copper wire and shall be installed in PVC Schedule 40 <br /> conduit and shall be buried to a depth meeting the NEC and local electrical codes . <br /> Acceptable copper wire types need to comply with any local requirements . If above <br /> ground conduit must be used , it shall be rigid . Conduit elbows located at the electrical <br /> panel should be rigid conduit. <br /> B . Trenching or Directional Boring <br /> 1 . The installing contractor shall be responsible for locating all public and privately <br /> owned underground utilities including , but not limited to , natural gas , electric , water , <br /> sewer, cable TV and telephone . Owner will provide drawings which show private <br /> utilities as best known . Contractor is responsible for confirming locations as needed <br /> to complete projects . <br /> 2 . Trenching depth and width shall be adequate to install appropriately sized conduit and <br /> to meet local and National Electrical Codes . <br /> 3 . Trenches shall be back-filled with excavated soil and compacted to approximately the <br /> same density of the surrounding soil to minimize settlement . Trenches will be sodded . <br /> 43 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\ 1042 VB Sports Village Lighting\Admim\bid documents\Bid Docs VBSV Lighting revised <br /> 12- 13 - IO . doc <br />