Laserfiche WebLink
thereby ; however, CONTRACTOR shall not be liable 2 . 07 Initial Acceptance of Schedules <br /> to OWNER or ENGINEER for failure to report any <br /> conflict , error, ambiguity , or discrepancy in the A. Unless otherwise provided in the Contract <br /> Contract Documents unless CONTRACTOR knew or Documents , at least ten days before submission of the <br /> reasonably should have known thereof. first Application for Payment a conference attended by <br /> CONTRACTOR , ENGINEER , and others as appropri - <br /> B . Preliminary Schedules: Within ten days after ate will be held to review for acceptability to ENGI - <br /> the Effective Date of the Agreement ( unless otherwise NEER as provided below the schedules submitted in <br /> specified in the General Requirements) , CONTRAC- accordance with paragraph 2 . 05 . 13 . CONTRACTOR <br /> TOR shall submit to ENGINEER for its timely review: shall have an additional ten days to make corrections <br /> and adjustments and to complete and resubmit the <br /> 1 . a preliminary progress schedule schedules . No progress payment shall be made to <br /> indicating the times ( numbers of days or dates) CONTRACTOR until acceptable schedules are <br /> for starting and completing the various stages submitted to ENGINEER . <br /> of the Work , including any Milestones specified <br /> in the Contract Documents ; 1 . The progress schedule will be <br /> acceptable to ENGINEER if it provides an <br /> 2 . a preliminary schedule of Shop orderly progression of the Work to completion <br /> Drawing and Sample submittals which will list within any specified Milestones and the <br /> each required submittal and the times for sub- Contract Times . Such acceptance will not <br /> mitting , reviewing , and processing such impose on ENGINEER responsibility for the <br /> submittal ; and progress schedule , for sequencing , scheduling , <br /> or progress of the Work nor interfere with or <br /> 3 . a preliminary schedule of values for relieve CONTRACTOR from CONTRACTOR ' s <br /> all of the Work which includes quantities and full responsibility therefor. <br /> prices of items which when added together <br /> equal the Contract Price and subdivides the 2 . CONTRACTOR ' s schedule of Shop <br /> Work into component parts in sufficient detail to Drawing and Sample submittals will be <br /> serve as the basis for progress payments acceptable to ENGINEER if it provides a <br /> during performance of the Work . Such prices workable arrangement for reviewing and <br /> will include an appropriate amount of overhead processing the required submittals . <br /> and profit applicable to each item of Work . <br /> 3 . CONTRACTOR ' s schedule of values <br /> Go &4l of inSUFanl Before an will be acceptable to ENGINEER as to form <br /> the Site is started , CONTRACTOR and OWNE all and substance if it provides a reasonable <br /> each deliver to the other, with copi o each allocation of the Contract Price to component <br /> additional insured identified in t upplementary parts of the Work . <br /> Conditions , certificates of urance (and other <br /> evidence of insurance jch either of them or any ARTICLE 3 - CONTRACT DOCUMENTS : INTENT , <br /> additional insur may reasonably request) which AMENDING , REUSE <br /> CONTRA and OWNER respectively are <br /> 3 . 01 Intent <br /> 2 . 06 Preconstruction Conference A. The Contract Documents are comple- <br /> mentary ; what is called for by one is as binding as if <br /> called for by all . <br /> to run , but before any Work at the Site i arted , a g It is the intent of the Contract Documents <br /> to <br /> conference attended by CONTRACT ENGINEER , <br /> and others as appropriate wil held to establish a describe a functionally complete Project (or part there- <br /> of) to be constructed in accordance with the Contract <br /> working uRd l the parties as to the Work and to disc a schedules referred to in para- Documents . Any labor, docum <br />entation , services , <br /> graph 2 . 05 . rocedures for handling Shop Drawings materials , or equipment that may reasonably be <br /> and er submittals , processing Applications for inferred from the Contract Documents or from <br /> prevailing custom or trade usage as being required to <br /> 17 no , produce the intended result will be provided whether <br /> or not specifically called for at no additional cost to <br /> OWNER . <br /> 00700 - General Conditions REV 04-07 <br /> 00700 - 9 <br /> CADocuments and Settings\jwilliams\Local Settings\Temporary Internet Files\Content. 0utlook\U08CAT5B\00700 - General Conditions REV 04-07 . doc <br />