B . OWNER shall ernpley and pay for the
<br /> seNiGes ef an independent testing laboratory to B . If ENGINEER considers it necessary or
<br /> perform all inspeGitions , tests , or approvals requiFed by advisable that covered Work be observed by ENGI -
<br /> NEER or inspected or tested by others , CONTRAC-
<br /> TOR , at ENGINEER ' s request, shall uncover, expose ,
<br /> 1 . fer inspeGtions, tests , or aper^ or otherwise make available for observation , inspec-
<br /> GGIVered by paragraphs 13 . 03 . G and 13 . ()3 . .D or testing as ENGINEER may require , that
<br /> below; portion of the Work in question , furnishing all neces-
<br /> sary labor, material , and equipment. If it is found that
<br /> 2 . that GGSt6 inGUrred on GonneGtion with such Work is defective , CONTRACTOR shall pay all
<br /> Claims , costs , losses , and damages ( including but not
<br /> paragraph 13 . 04 . 13 shall be paid as provided in limited to all fees and charges of engineers , architects ,
<br /> said paragraph 13 . 04 . 13i attorneys , and other professionals and all court or
<br /> arbitration or other dispute resolution costs) arising out
<br /> of or relating to such uncovering , exposure , observa-
<br /> tion , inspection , and testing , and of satisfactory
<br /> replacement or reconstruction ( including but not
<br /> C . If Laws or Regulations of any public body limited to all costs of repair or replacement of work
<br /> of
<br /> having jurisdiction require any Work ( or part thereof) others ) ; and OWNER shall be entitled to an
<br /> specifically to be inspected , tested , or approved by an appropriate decrease in the Contract Price . If the
<br /> employee or other representative of such public body, parties are unable to agree as to the amount thereof,
<br /> CONTRACTOR shall assume full responsibility for OWNER may make a Claim therefor as provided in
<br /> arranging and obtaining such inspections , tests , or paragraph 10 . 05 . If, however, such Work is not
<br />found
<br /> approvals , pay all costs in connection therewith , and to be defective , CONTRACTOR shall be allowed an
<br /> furnish ENGINEER the required certificates of inspec- increase in the Contract Price or an extension of the
<br /> tion or approval . Contract Times (or Milestones ) , or both , directly
<br /> attributable to such uncovering , exposure ,
<br /> D . CONTRACTOR shall be responsible for observation , inspection , testing , replacement , and
<br /> arranging and obtaining and shall pay all costs in reconstruction . If the parties are unable to agree
<br />as to
<br /> connection with any inspections , tests , or approvals the amount or extent thereof, CONTRACTOR may
<br /> required for OWNER Is and ENGINEER ' s acceptance make a Claim therefor as provided in paragraph
<br /> of materials or equipment to be incorporated in the 10 . 05 .
<br /> Work ; or acceptance of materials , mix designs , or
<br /> equipment submitted for approval prior to 13 . 05 OWNER May Stop the Work
<br /> CONTRACTOR ' s purchase thereof for incorporation
<br /> in the Work . Such inspections , tests , or approvals A . If +she—Work is—defective or CONTRACTnp
<br /> shall be performed by organizations acceptable to f@616 t0 SUPPly SUffiGient skilled workers (DF suitable
<br /> OWNER and ENGINEER . materials or or fails to peFform the Wer
<br /> equipment ,
<br /> SUGh a way that the GGIrripleted Werk Wall Genform to
<br /> E . If any Work (or the work of others) that is to the Gc) ntr.;; r.,t D. A. r., urnents , OWNER may order
<br /> G
<br /> be inspected , tested , or approved is covered by CON - TRAGTQR to step the Work , or any pGFtien thereof-,
<br /> TRACTOR without written concurrence of ENGI - the 'nr S „ ^ h order has been eliminated ;
<br /> NEER , it must, if requested by ENGINEER , be uncov- shall
<br /> ered for observation . n (Dt give rise to any duty on the part of OWNER to
<br /> exeFG! se this right for the benefit of GQNTRACTOR ,
<br /> F . Uncovering Work as provided in paragraph any SubGontFaGtOr, any Supplier, any other individua_1
<br /> 13 . 03 . E shall be at CONTRACTOR ' s expense unless er entity , er any surety fer, or employee or agent of
<br /> CONTRACTOR has given ENGINEER timely notice any of-them-
<br /> of CONTRACTOR ' s intention to cover the same and
<br /> ENGINEER has not acted with reasonable prompt-
<br /> ness in response to such notice .
<br /> 13 . 04 Uncovering Work
<br /> A . If any Work is covered contrary to the written
<br /> request of ENGINEER , it must, if requested by ENGI -
<br /> NEER , be uncovered for ENGINEER ' s observation
<br /> and replaced at CONTRACTOR' s expense .
<br /> 00700 - General Conditions REV 04-07
<br /> 00700 - 36
<br /> CADocuments and Settings\jwilliams\Local Settings\Temporary Internet Files\Content. Outlook\U08CAT5B\00700 - General Conditions REV 04-07. doc
<br />
|