Laserfiche WebLink
SECTION 00454 - Sworn Statement Under the Florida Trench Safety Act <br /> THIS FORM MUST BE SIGNED BY THE BIDDER WHO WILL BE RESPONSIBLE FOR <br /> THE EXCAVATION WORK ("BIDDER") , OR ITS AUTHORIZED REPRESENTATIVE, IN <br /> THE PRESENCE OF A NOTARY PUBLIC AUTHORIZED TO ADMINISTER OATHS . <br /> 1 . This Sworn Statement is submitted with Project No . 1042 for Vero Beach Sports Village <br /> Sports Lighting Systems <br /> 2 . This Sworn Statement is submitted by Electrical Contracting Service , Inc . <br /> 2375 West 77th Street , Hialeah ,Ja FL me f 31301 6 �tingswomstatement) <br /> hereinafter" <br /> BID?5FRn Wes BIDDER 's address s Hialeah , FL 33016 <br /> BIDDER ' s Federal Employer Identification Number ( FEIN ) is 59 - 2 -9 -9210 -2- <br /> 3 . <br /> - 5S21n23 . My name is Charles H . Floyd and my relationship to the BIDDER <br /> (Print Name of Individual Signing ) <br /> is President <br /> (Position or Title) <br /> I certify , through my signature at the end of this Sworn Statement , that I am an authorized <br /> representative of the BIDDER . <br /> 4 . The Trench Safety Standards that will be in effect during the construction of this Project are <br /> contained within the Trench Safety Act, Section 553 . 60 et seg Florida Statutes and refer to <br /> the applicable Florida Statue(s) and/or OSHA Regulation (s) and include the "effective date " <br /> in the citation (s) . Reference to and compliance with the applicable Florida Statute(s) and <br /> OSHA Regulation (s) is the complete and sole responsibility of the BIDDER . Such reference <br /> will not be checked by OWNER or ENGINEER and they shall have no responsibility to review <br /> or check the BIDDER ' s compliance with the Trench Safety Standards . <br /> 5 . The BIDDER assures the OWNER that it will comply with the applicable 'Trench Safety <br /> Standards , <br /> 6 . The BIDDER has allocated and included in its bid the total amount of <br /> based on the linear feet of trench to be excavated over five ( 5 ) feet deep , for compliance with <br /> the applicable Trench Safety Standards , and intends to comply with said standards by <br /> instituting the following specific method ( s ) of compliance on this Project: <br /> The determination of the appropriate method (s ) of compliance is the complete and sole <br /> responsibility of the BIDDER . Such methods will not be checked by the OWNER or <br /> ENGINEER for accuracy , completeness , or any other purpose . The OWNER and <br /> ENGINEER shall have no responsibility to review or check the BIDDER 's compliance with the <br /> Trench Safety Standards , <br /> 7 . The BIDDER has allocated and included in its bid the total amount of $ rA <br /> based on the square feet of shoring to be used for compliance with shoring safety <br /> requirements and intends to comply with said shoring requirements by instituting the <br /> following specific method (s ) of compliance on this Project: <br /> The determination of the appropriate method (s) of compliance is the complete and sole <br /> responsibility of the BIDDER . Such methods will not be checked by tht � OWNER or <br /> ENGINEER for accuracy , completeness or any other purpose . The OWNER and ENGINEER <br /> 16 <br /> r :\PurchasingP\Rids\20l0-20ll FY (2011000)\2011025 Vero Beach Sports Village Sports Lighting System\Rid Does VRSV Lighting revised Section <br /> 1 .doc <br />