My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-020
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 11:28:02 AM
Creation date
10/1/2015 1:44:20 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
02/01/2011
Control Number
2011-020
Agenda Item Number
8.H.
Entity Name
Electrical Contracting Service Inc.
Vero Beach Sports Village
Subject
Bid Award Lighting System County Funding Project
Area
Vero Beach Sports Village
Project Number
1042
Bid Number
2011025
Alternate Name
Dodgertown
Supplemental fields
SmeadsoftID
9284
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART 2 - PRODUCT <br /> 2 . 1 LIGHTING SYSTEM CONSTRUCTION <br /> A . DELETE THIS ITEM ENTIRELY AND REPLACE WITH THE FOLLOWING : <br /> A. System Description: Lighting system shall consist of the followings <br /> 1 . Galvanized steel poles or concrete poles and galvanized steel crossarm assembly <br /> 2. Pre-stressed concrete base embedded in concrete backfill allowed to cure for minimum 24 hours <br /> before pole stress is applied. Alternate may be an anchor bolt foundation designed such that the <br /> steel pole and any exposed steel portion of the foundation be located a minimum of 18 inches <br /> above final grade. Anchor bolt foundation concrete must cure for a minimum of 28 days before <br /> the pole stress Is applied. <br /> OR <br /> Pre-stressed concrete poles, direct buried or installed on concrete foundation, are allowed, <br /> pending approval of design from Professional Structural Engineer or Professional Geotechnical <br /> Engineer licensed in the State of Florida. <br /> 3. All luminaires shall be constructed with a die-cast aluminum housing or external hall shroud to <br /> protect the luminaire reflector system. <br /> 4. Wire harness complete with an abrasion protection sleeve, strain relief and plug-in connections <br /> for fast, trouble-free installation. <br /> 2.2 STRUCTURAL PARAMETERS <br /> D. 1 . THROUGH 3 DELETE THESE ITEMS ENTIRELY AND REPLACE WITH THE FOLLOWING : <br /> 1. Providing engineered foundation embedment design for alternate design by a registered <br /> engineer in the State of Florida <br /> 2. Additional materials required to achieve alternate foundation. <br /> 3. Excavation and removal of materials other than normal soils, such as rock, muck, etc. <br /> E. DELETE ITEM ENTIRELY AND REPLACE WITH THE FOLLOWING : <br /> E. Foundation Drawings: Project specific foundation drawings stamped by a registered engineer in the <br /> state where the project is located are required. The foundation drawings must list the moment, shear <br /> (horizontal) force, and axial (vertical) force at ground level for each pole. <br /> PART 4 - EXECUTION <br /> 4. 1 INSTALLATION <br /> DELETE THE ENTIRE BEGINNING SENTENCE AND REPLACE WITH THE FOLLOWING : <br /> Page 4of7 <br /> F.'Wublic WorksIENGINEERING DIVISION PROJECTS11042 VB Sports Village LightingUdmimlbid documentstAddendumrLIDDENDVM No l.dac <br />
The URL can be used to link to this page
Your browser does not support the video tag.