Laserfiche WebLink
The entire system Is to be Installed In accordance with the manufacturer's written Instructions, <br /> and approved construction drawings. <br /> 4.2 ELECTRICAL <br /> A. 1 . d. DELETE ITEM ENTIRELY AND REPLACE WITH THE FOLLOWING : <br /> d. Conductors and conduit for the feeder circuit from the service entrance panel board <br /> (or from the contactor panel if applicable) to the safety disconnect. <br /> A. 1 . e, DELETE ITEM ENTIRELY AND REPLACE WITH THE FOLLOWING : <br /> e. Grounding conductors and grounding methods for the following: <br /> 1. The main service entrance panel board. (per NEC or local codes) <br /> 2. The lighting contactor enclosure. (per NEC or local codes) <br /> 3. Each electrical component enclosure mounted on or within the <br /> lighting poles. (Equipment Grounding System) (per NEC or local <br /> codes) <br /> 4. Lightning Protection for Individual poles as follows (per NFPA 780): <br /> a. A 5/8 " x 8 ' copper grounding rod burled vertically In undisturbed <br /> earth. <br /> b. A copper grounding conductor size #2/0 shall be used. <br /> SUBMITTAL CHECKLIST <br /> Design Submittal Data Checklist and Certification <br /> DELETE ENTIRE CHECKLIST AND REPLACE WITH REVISED CHECKLIST <br /> A complete section of Technical Specifications and Submittal Checklist ( pages 36 through <br /> 45) is attached and supersedes previously distributed pages . <br /> Page S of 7 <br /> F.•V Puhlic Wolk lENCINEERlNG DIVISION PROJECTS11042 VB Sporfs rillage LightingL4dmlmlbid documentsL4ddendumsUDDENDUM No 1. dac <br />