Laserfiche WebLink
CLARIFICATIONS / CORRECTIONS WON ' T) • <br /> 2 . Transformer pad (approximately 10 feet away from existing transformer located between ball <br /> fields 1 and 2 must be constructed as part of this project and cost to be included in bid price for <br /> project. Conduit must also be included in this project between existing and new transformer. <br /> Cost of installation of conduit to be included in bid price for project . Cost for new electrical <br /> transformer will be paid to the City of Vero Beach Utilities by Indian River County. Three <br /> Phase Transformers Concrete Pad Detail is attached . Contact person at the City of Vero <br /> Beach Utilities is Chris Blahnik (772) 978 -5467. <br /> 3 . For clarification , the Remote Monitoring System and the Remote Lighting Control System have <br /> been eliminated and are not required as part of this project . <br /> 4 . The last day that you can submit questions or comments (and them answered ) is Tuesday , <br /> January 11 , 2011 . <br /> ATTACHMENTS . <br /> Revised Sheets 36 through 49 (Technical Specifications ) <br /> Transformer Pad Detail ( 1 sheet) <br /> Pre-Bid fleeting Minutes ( 5 sheets) <br /> Sign-In Sheets from Pre- Bid Meeting ( 3 sheets ) <br /> Page 6 of 7 <br /> F:iPublic {VorksIENGINEERING DIVISION PROJECTSild42 VB Spores Vlllage LightingL4dmlmlbld documentsL4ddendumsL4DDENDUM NO I. doc <br />