My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-020
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 11:28:02 AM
Creation date
10/1/2015 1:44:20 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
02/01/2011
Control Number
2011-020
Agenda Item Number
8.H.
Entity Name
Electrical Contracting Service Inc.
Vero Beach Sports Village
Subject
Bid Award Lighting System County Funding Project
Area
Vero Beach Sports Village
Project Number
1042
Bid Number
2011025
Alternate Name
Dodgertown
Supplemental fields
SmeadsoftID
9284
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pre-stressed concrete poles, direct buried or installed on concrete foundation, are allowed, <br /> pending approval of design from Professional Structural Engineer or Professional <br /> Geotechnical Engineer licensed in the State of Florida. <br /> 3. All luminaires shalt be constructed with a d/e-cast aluminum housing or external hall <br /> shroud to protect the luminaire reflector system. <br /> 4. Wire harness complete with an abrasion protection sleeve, strain relief and plug-In <br /> connections for fast, trouble-free Installation. <br /> B. Durability: <br /> 1 . All exposed components shall be constructed of corrosion resistant material and/or coated to <br /> help prevent corrosion. All exposed carbon steel shall be hot dip galvanized per ASTM A123 . <br /> All exposed aluminum shall be powder coated with high performance polyester or anodized . <br /> All exterior reflective inserts shall be anodized , coated , and protected from direct <br /> environmental exposure to prevent reflective degradation or corrosion . All exposed hardware <br /> and fasteners shall be stainless steel of 18-8 grade or better, passivated and coated for <br /> protection against corrosion and stress corrosion cracking . All wiring shall be enclosed within <br /> the crossarms, pole , or electrical components enclosure. <br /> 2 . To ensure added durability the luminaires must pass a 1G , 100 , 000 cycle vibration test in each <br /> of two planes . <br /> C . Lightning Protection : All structures shall be equipped with lightning protection meeting NFPA 780 <br /> standards. Contractor shall install a 20' ground rod. Each ballast enclosure and contactor cabinet to <br /> include appropriate surge protection . <br /> D. Safety: All system components shall be UL Listed for the appropriate application . <br /> 2.2 STRUCTURAL PARAMETERS <br /> A. Support Structure Wind Load Strength : Poles and other support structures, brackets, arms, bases, <br /> anchorages and foundations shall be determined based on the 2007 edition of the Florida Building <br /> Code , wind speed of 140, exposure category C and an importance factor of 1 .0. Luminaire, visor, and <br /> crossarm shall withstand 150 mph winds and maintain luminaire aiming alignment Foundation design <br /> will be based on 2007 FBC, 140 MPH , Exposure C, Standard AASHTO . <br /> B. Structural Design : The stress analysis and safety factor of the poles shall conform to AASHTO 2001 <br /> ( LTS-4) Standard Specifications for Structural Supports for Highway Signs, Luminaires and Traffic <br /> Signals. <br /> C . Soil Conditions : The design criteria for these specifications are based on soil design parameters as <br /> outlined in the geotechnical report. If a geotechnical report is not provided by the owner, the foundation <br /> design shall be based on soils that meet or exceed those of a Class 5 material as defined by 2007 <br /> FBC, Table 1804 . <br /> D. It shall be the contractor's responsibility to notify the owner if soil conditions exist other than those on <br /> which the foundation design is based , or if the soil cannot be readily excavated . Contractor may issue <br /> a change order request / estimate for the owner's approval / payment for additional costs associated <br /> with : <br /> 1 . <br /> €IOFida <br /> . <br /> 9. Providing engineered foundation embedment design for alternate design by a <br /> registered engineer in the State of Florida <br /> 1 Addit/onal materlals required to achieve alternate foundation, <br /> 43 <br /> FAPublic Works\ENGINEERING DIVISION PROJECTS\ 1042 VII Sports Village Lighting\Admim\bid documents\ADDENDUM NO. I TECH <br /> SPECS I -7-1I .doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.