My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-020
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 11:28:02 AM
Creation date
10/1/2015 1:44:20 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Bid
Approved Date
02/01/2011
Control Number
2011-020
Agenda Item Number
8.H.
Entity Name
Electrical Contracting Service Inc.
Vero Beach Sports Village
Subject
Bid Award Lighting System County Funding Project
Area
Vero Beach Sports Village
Project Number
1042
Bid Number
2011025
Alternate Name
Dodgertown
Supplemental fields
SmeadsoftID
9284
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUBMITTAL CHECKLIST <br /> Design Submittal Data Checklist and Certification <br /> Tab Item Descrl tion <br /> Listing of all information being submitted must be included on the table of contents. List <br /> A Checklist the name of the manufacturer's local representative and his/her phone number. Signed <br /> submittal checklist to be included. <br /> B Equipment Drawing(s) showing field layouts with pole locations. <br /> La out <br /> Lighting design drawing(s) showing: <br /> a. Field Name, date, file number, prepared by, and other pertinent data <br /> b. Outline of field(s) being lighted, as well as pole locations referenced to the center of <br /> the field (x & y),or homeplate for baseball/softball fields. Illuminance levels at grid <br /> spacing specified <br /> On Field c• Pole height, number of fixtures per pole, as well as luminalre Information including <br /> C Lighting wattage, lumens and optics <br /> Design d, Height of light level test meter above field surface <br /> e. Summary table showing the number and spacing of grid points; average, minimum <br /> and maximum illuminance levels In foot candles (fc); uniformity including maximum <br /> to minimum ratio, coefNcient of variance and uniformity gradient; number of <br /> luminaries, total kilowatts, average tilt factor; light loss factor. <br /> f. Alternate manufacturers shall provide both Initial and maintained light scans using a <br /> maximum 0. 70 Li ht Loss Factor to calculate maintained values. <br /> Off Field Lighting design drawing showing initial horizontal split light levels along the boundary line <br /> D Lighting (180 Ft) In footcandles. Hordzontal levels shall be at 30400t Intervals along the boundary <br /> Design line. Readings shall be taken with the meter orientation at horizontal. <br /> Photometric Provide photometric report for a typical luminalre used showing candela tabulations as <br /> E Report defined by IESNA Publication LW3"Z Photometric data shall be certified by laboratory <br /> with current National Voluntary Laboratory Accreditation Program or an independent <br /> testin facilitywith over 5 years experience, <br /> Luminaire Document showing each luminaire 's aiming angle and the poles on which the luminaries <br /> F Aiming are mounted. Each aiming point shall ident! <br /> Summa fy the type of luminalre. <br /> Structural Pole structural calculations and foundation design showing foundation shape, depth <br /> G Information backfill requirements, rebar and anchor bolts (If required). Pole base reaction forces shaft <br /> be shown on the foundation drawing along with soil bearing pressures. Design must be <br /> stamped by a structural en ineer in the state of FL <br /> Performance Provide performance guarantee including a written commitment to undertake all <br /> H Guarantee corrections required to meet the performance requirements noted in these specifications at <br /> no expense to the owner. Light levels must be guaranteed per gpeciffcation for 29 Years, <br /> I Warranty Provide written warranty Information Including all terms and conditions. <br /> Project Manufacturers bidding any form of light system must provide a minlnwm of five (5) project <br /> J References references within the state of Florida that have been completed within the last two (2) <br /> calendar years utilizing this exact technology. <br /> K Product Complete set of product brochures for all components, including a complete parts list; UL <br /> Information Listings, and Manufacturers Certificate of Corrosion Protection. <br /> f L Delivery Manufacturer shall supply an expected delivery timeframe from receipt of approved <br /> submittals and complete order Information. <br /> M Non- Manufacturer shall list all Items that do not comply with the specifications. If in full <br /> Compliance compliance, tab may be omitted. <br /> I understand that the Information supplied herein shall be used for the purpose of complying with <br /> the <br /> specifications for Vero Beach Sports Village Sports Lighting, By signing below I agree that all requirements of the <br /> specifications have been met and that the manufacturer will be responsible for any future costs incurred to bring <br /> their equipment into compliance for all items not meeting specifications and not listed in the Non-Compliance <br /> section. <br /> Contractor. Signature: <br /> Contact Name: Date. <br /> 48 <br /> F :\Public Works\ENGINEERING DIVISION PROJECTS\1042 V13 Sports Village I.ightingWmimlbid documents\ADDENDUM NO. i TECI-I <br /> SPECS 1 -7- 11.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.