Laserfiche WebLink
ATTACHMENT A- 1 <br /> PROJECT WORK PLAN <br /> WABASSO BEACH RESTORATION <br /> The PROJECT consists of the restoration and maintenance of approximately 6 . 1 miles of Atlantic shoreline <br /> between FDEP Reference Monuments R20 and R55 . In addition , the project includes emergency dune <br /> restoration for Wabasso Beach Park, Baytree , Marbrisa and Sea Grape trail . The DEPARTMENT during the <br /> construction phase will only cost share on work done within the critically eroded section of the project , R20 to <br /> 851 . 3 . The PROJECT shall be conducted in accordance with the terms and conditions set forth under <br /> this <br /> Agreement, all applicable DEP permits and the eligible project task items established below . All data collection <br /> and processing, and the resulting product deliverables , shall comply with the standard technical specifications <br /> contained in the Department ' s Regional Data Collection and Processing Plan and Geographic Information <br /> System Plan , unless otherwise specified in the approved Scope of Work for an eligible PROJECT item . These <br /> plans may be found at http : //www . dep . state . fl . us/beaches/ . Three ( 3 ) originals and one ( 1 ) electronic copy of all <br /> written reports developed under this Agreement shall be forwarded to the Department, unless otherwise <br /> specified . <br /> Task No : Eligible Project Item : <br /> 2 . 0 Design and Permitting <br /> Professional services required for engineering and design , obtaining environmental permits and <br /> other authorizations and the preparation of plans and specifications . This item specifically excludes <br /> permit application fees or any other fees paid to the State of Florida . <br /> 2. 1 Design and Permitting <br /> Coastal Technology Corporation , Inc . has been retained by Indian River County to conduct design <br /> and permitting activities associated with the Wabasso Beach Restoration Project . Tasks included as <br /> part of the design and permitting efforts include the following : Plan Formulation , Design , Permit <br /> Application , FDEP Permit Processing, USACE Permit Processing and NEPA Compliance and <br /> Project Administration and Coordination , engineering and geological analyses, controlled aerial <br /> photography, biological mapping and characterization , turtle abundance and QA/QC coordination of <br /> investigations . Total cost for the described tasks is $ 1 ,429 , 548 . 00 . The described activity costs are <br /> shared and conducted in concert with contract 071R <br /> 2 .2 Design and Permitting - ECL 2009 <br /> Coastal Technology Corporation , Inc . and Morgan & Eklund have been retained by Indian River <br /> County to conduct design and permitting activities associated with the Wabasso Beach Restoration <br /> Project ( Sector 3 ) . Tasks included as part of the design and permitting efforts include establishment <br /> of the Erosion Control Line . Initially this will involve surveying and plotting the mean high water <br /> line , preparing the legal description and coordination with the Department of Environmental <br /> Protection for review and approval of MHW survey . <br /> REMAINDER OF PAGE INTENTIONALLY LEFT BLANK <br /> DEP Agreement No . 07182 , Amendment No . 1 , Attachment A- 1 Page I of 2 <br />