My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-103A
CBCC
>
Official Documents
>
2010's
>
2011
>
2011-103A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2016 1:38:43 PM
Creation date
10/1/2015 2:24:12 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Cash Deposit and Escrow Agreement
Approved Date
05/03/2011
Control Number
2011-103.A.
Agenda Item Number
8.F.
Entity Name
Wild Turkey Estates of Vero LLC
Subject
Amendment to Agreement for Restoration Phase 1
Area
Wild Turkey Sand Mine
Project Number
SP-MA-07-10-34
Supplemental fields
SmeadsoftID
9765
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATRUECOPY <br /> CERTIFICATION ON LAST PAGE <br /> . JX BARTON , CLERK <br /> Restoration Bond / Cost Estimate <br /> Wild Turley — Phase I <br /> The IRC mining permit is re- issued every year . It is anticipated that the restoration bond will be re - <br /> evaluated each year based on what is scheduled to be completed in the next year . <br /> 1 . Each successive phase cannot commence until the previous phase is restored . Therefore , <br /> grading, stabilization and drainage are included for Phase 1 ( approx . 30 ac ) . <br /> 2 . The landscape requirements ( perimeter lake trees ) for Phase I ( approx . 86 trees ) . <br /> 3 . The haul route and swale servicing Phase 1 ( 3 , 000 LF +/- ) . Assume approximately % of the 22 ' <br /> wide green area and 20 ' haul route will need to be restored . This will be used to access the <br /> constructed - restored water body . <br /> 4 . Seed / mulch and minor grading of stockpile area ( assume Y2 +1- of 15 ac area ) <br /> S . The following are not included in the restoration bond : <br /> a . Perimeter buffer/ berms : Condition no . 2 of the IRC site plan approval requires the <br /> construction of the berms/ buffer, and acceptance by IRC prior to any exporting of <br /> material . Therefore , the assumption is that this will be completed prior to significant <br /> mining activities that would require restoration . <br /> b . Mitigation planting : SJR mitigation plantings are not required until phase 3 is completed . _ <br /> This cost will be added at a future date , at pre - issuance of annual mining permit . <br /> c . Re -excavating SRID canal C- 11 ( east 1400 LF ) and seed - mulch disturbed areas is not <br /> included in this restoration bond as it was included in a separate restoration bond <br /> provided to SRID . <br /> 6 . Phase I does not include any littoral areas . <br /> J :\07-018 Wild Turkey Estates\ Documents\Reports\04- 25- 11 Revised Restoration Bond . docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.