My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/21/1972
CBCC
>
Meetings
>
1970's
>
1972
>
6/21/1972
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:24:54 AM
Creation date
6/10/2015 2:16:27 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/21/1972
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION III — THE OWNER'S RESPONSIBILITIES <br />The Owner shall: <br />1. Provide full information as to his requirements for the Project. <br />2, Assist the Engineer by placing at his disposal all available information <br />pertinent to the site of the Project including previous reports and any .other data <br />relative to design or construction of the Project. <br />3. Guarantee access to and make all provisions for the Engineer, to enter upon <br />public and private lands as required for the Engineer to perform his work under this <br />Agreement. <br />4. Examine all studies, reports, sketches, estimates, drawings, specifications, <br />proposals and other documents presented by the Engineer and shall render in writing <br />decisions pertaining thereto within a reasonable time so as not to delay the work of <br />the Engineer. <br />5. Furnish, or direct the Engineer to provide at the Owner's expense, necessary <br />additional services as stipulated in Section II of _this Agreement, or other services <br />.required. <br />SECTION IV — PERIOD OF SERVICE <br />1. The services called for in the preliminary report phase of this Agreement <br />shall be completed, and the report submitted within 240 days following <br />authorization for the Engineer to proceed. <br />2. Unless sooner terminated as provided in Section VI, Paragraph 1., this <br />Agreement shall remain in force for a period which may reasonably be required for <br />completion of the preliminary engineering report described in Section I.B., including <br />extra work and any required extension thereto. <br />SECTION V — P.AYMENTS TO THE ENGINEER <br />A. PAYMENTS FOR BASIC SERVICES OF THE ENGINEER UNDER SECTION I <br />L. For professional services performed under Section I.B., 'Master Planning and <br />Prelinthtary Engineering Report Phase," the Owner shall pay the Engineer, upon <br />receipt of the Master Plan and Preliminary Engineering Report, the dump sum <br />amount of $ 90,000.00 <br />-1�- <br />
The URL can be used to link to this page
Your browser does not support the video tag.